Elevator cabs

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Linda Davisson  on 

Often the finishes in an elevator cab are inert materials/non-emitting such as metal panels for walls and plastic unit lighting for ceilings.

1
Tue Feb 8, 2011, 6:51 pm

How to calculate Process Energy for CS?

CS-2009 EAp2:Minimum energy performance
posted by  Tatjana Ernst  on 

Hi everyone, we have an Core & Shell-Office Building. We are wondering how we have to calculate the process energy.

1
Mon Feb 14, 2011, 1:30 pm

Lift Energy assessment in LEED

NC-2009 EAc1:Optimize energy performance
posted by  Edwin Wealend  on 

Hi Is lift energy included as a process load as part of the 25% minimum requirement for process loads? If so are there any references or guidance on how to estimate its energy consumption.

1
Wed Feb 9, 2011, 2:08 pm

Growth and Erosion

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  Adriana Hansen  on 

We have an HVAC system configured with ceiling plenum return. Is this plenum required to meet item (§ 5.5.1) Resistance to Mold Growth and (§ 5.5.2) Resistance to Erosion of ASHRAE 62.1?

1
Wed Feb 23, 2011, 11:35 pm

Cal Green Code Maximum Flow Rate for Non-Residential Fittings

NC-2009 WEp1:Water use reduction
posted by  Jeremy Cressman  on 

Just when you thought you figured out the new commercial LEED faucet baseline (.5gpm or .25gallons per cycle) ... The State of California adopts the CalGreen Building Code effective January 2011 r

0

Owner maintained carpet entry systems

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Susan Walter  on 

I have an in patient Hospital project and we are providing roof gardens and access to those gardens. Hooray for direct access to nature! My question in on the entryway systems.

1
Fri Mar 4, 2011, 2:55 pm

Tenant Sub-metering Question

CS-2009 EAc5.2:Measurement and verification - tenant submetering
posted by  Lorey Flick  on 

What is a typical "centrally monitored" system? I have a core and shell space that will be providing sub-metering for it's tenant and a monthly bill indicating usage, peak, and cost.

1
Fri Feb 25, 2011, 12:40 am

Clarification on minimum energy savings and EA credit 1

NC-2009 EAp2:Minimum energy performance
posted by  Joanne Haye  on 

I have a Client that is considering LEED certification, we have done a preliminary energy model, we show a 24% savings off the baseline.

1
Fri Feb 11, 2011, 9:46 pm

Activity Generated Electricity from a Manufacturing process

NC-2009 EAc2:On-site renewable energy
posted by  Kendal Neitzke  on 

Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors.

1
Fri Feb 11, 2011, 7:22 pm

runoff coefficient

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  Eric Yao  on 

what the value of runoff coefficient for gravel area (2% gradient)?

1
Wed Feb 16, 2011, 8:22 pm