TURF IN LANDSCAPING
EBOM-2009 SSc5:Site development - protect or restore open habitatposted by Stephen Redding on
Page 36 of the Ref Guide, section 4, states that monoculture plantings (such as turf) cannot contibute to the credit requirements. I could interpret this 2 ways: a.
Metallic Glaze that is LEED complaint
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Megan Bove on
In reviewing submittals with the painting trade on my project, we came across the specified a specified paint that we are looking for a substitute.
Modeling the Baseline
NC-2009 EAc1:Optimize energy performanceposted by Carolina Vergnano on
I've seen some discussion about the section G3.1.1 from ASHRAE 90.1-2007, but I still have some doubt about it. I'm working in a project that is a build-to-suit office building with 13 floors.
Sample of POE survey form?
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Eric JS on
Dear all, Do you have any sample of POE survey form that can satisfy this credit? Thanks and regards
FTE to SS 3.2 LEED CI case
CI-2009 SSc3.2:Alternative transportation - bicycle storage and changing roomsposted by Paola Figueiredo, Newton Figueiredo on
How can I proceed with the credit SS 3.2 for a LEED CI v2.0, when the Tenant FTE exceed the number of FTE default calculation (total sf/250sf) for the Certified Core and Shell v2.2 Building, which
Service Hot Water Efficiency Proposed vs. Baseline
NC-2009 EAp2:Minimum energy performanceposted by Paul Bohres on
How do you account for the difference in service hot water efficiency from the proposed design to the baseline design if the proposed design is using electric point-of-use water heaters?
Calculating a Dome
NC-2009 SSc7.2:Heat island effect - roofposted by Norma Lehman on
We have a roof that consists of a flat roof with a dome. How do we calculate the dome area since some of the surface area is actually the "sides" of the dome.
Tenant vacancy
EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Xun Jia on
Do spaces that are not regularly cleaned such as mechanical rooms and tenant storage rooms need to be counted as the 10% exempted?
EAp2, Option 2
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by susan eguia on
Hi, I've got the offline calculator for EAp2. Once completed the eligibility requirements do we still need to input at Energy Star Portfolio tool?
Airport jetway re-use
CI-2009 MRc3.1:Materials reuseposted by Raphael Sperry on
We have an unusual case in an airport project I am working on. It is LEED-CI as we are refurbishing a passenger concourse and some of the back-of-house spaces that go with it.