Forum quick links
Providing supporting info for "common materials" (reverb calcs)
Schools-2009 IEQp3:Minimum acoustical performanceposted by Renee Shirey on
The LEED v3 Reference book provides a table of "common materials". The LEED Online template asks for supporting documentation for all the materials used as an acoustic material finish.
MERV Filter during and after Test run
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Yong Lee Low on
Regarding the MERV filter, I had advised the M&E the LEED Requirements and he has replied as "During the test run period (80days), the MERV 8 will be installed on the AHU, PAH & VRF Indoor
IAQ - Visual Documentation
CI-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Gregory Minott on
I am working on an existing government project with restrictions on photography within the building.
Does the 10% exclusion rule apply to this credit?
EBOM-2009 EAp3:Fundamental refrigerant managementposted by Jessica Hawley on
Does the 10% exclusion rule apply to this credit?
Existing bus stop
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by lance mccardle on
We are doing a major renovation on a multifamily housing complex that was built in 1990 with bike racks and a bus stop that the owners put in when the building was first constructed.
EAp2 X Multiple Building
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Adriana Hansen on
Dears, We would like to solve out some questions about the LEED EB certification process. In this case we have a boundary area with 4 towers.
How to deal with insecticide?
CS-2009 IEQc3:Construction IAQ management plan - during constructionposted by Gabriela Hernández Castillo on
Our project is located at an area where COMEJEN is usual due to a very humid climate. COMEJEN is a sort of termite who lives in concrete cracks.
NC EAc6 Green Power - what is considered total building power?
NC-2009 EAc6:Green powerposted by Michael Hobson on
To quantify the total building's energy use and determine the 35% threshold to accomodate this credit, do we also include site power such as lighting, security, etc.?
Moisture Protection
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Brad Buser on
I need some help understanding the moisture projection requirements of this credit.
Recyclables + Sensitive Paper Estimate?
EBOM-2009 MRc7:Solid waste management - ongoing consumablesposted by Paul C on
We recently hire a new waste hauler who uses scaled front loader trucks to collect our waste & recyclables.