Forum quick links
Uploading Documentation
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Maya Karkour on
Hi all, When submitting documentation for this credit, through LEED Online, are we supposed to upload all the plans showing the thermal controls or can we just upload some of them (i.e.
EAp1
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Christopher Kung on
We did our in house Level 1 Walk Through in 2007 and we got the Energy Label.
Garbage disposals with on-site wastewater treatment?
Schools-2009 WEc4:Process water use reductionposted by Anya Fiechtl on
The intent for this credit is "To maximize water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems." The principal at our school was not willing to
Wellness Facility
NC-2009 IDc1:Innovation in designposted by Glenda Mayo on
We are looking for ideas for a university Wellness Facility which will house the counseling, and health services for campus students.
FM-200 (HFC-227ea) as Clean Agent Fire Suppression
NC-2009 EAc4:Enhanced refrigerant managementposted by Ted Vanderlinden on
Clean agent fire suppressant materials have no bearing on the Life Cycle Ozone Depletion calculation as they are not used as refrigerants.
Reused Metal Shelving
CI-2009 MRc3.2:Materials reuse - furniture and furnishingsposted by James Shook on
We have a library renovation project that is reusing the existing shelving in the space instead of purchasing new.
Baseline Building Envelope requirements
NC-2009 EAc1:Optimize energy performanceposted by alberto carlesi on
Hi, I'm modeling a building (not residential),for EAc1, located in climate zone 6 (winter design temperature 5°F).
Base Building for a mixed use project
NC-2009 EAc1:Optimize energy performanceposted by Graciela Carrillo on
We have a project that is a mix-used 23,000 SF bldg. The lower story is commercial (8,000 SF) and 2-stories of residential (15,000 SF).
Graphic Ink
CI-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Grace Ming on
Hello all, One of our CI project will be using the blinds with Graphic prints. My question is if the ink needs to comply with any of IEQ requirements? Any guidance would be greatly appreciated.
Determining compliance
NC-2009 SSc6.2:Stormwater design - quality controlposted by Tiago e Silva on
I’m working on a Project in Portugal, which consists in a 13.400m2 site, with 6000m2 rooftop (harvests rain), 2500m2 green roof, 2735m2 of gardens, 306 m2 of planters and 1840m2 of impermeable pave