In Kind Donations?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by John Kinch on
Hi, I work for a non-profit attempting to get this credit, and we had an interior design company donate two very nice nearly-new chairs amounting to $700 each.
LEED for Schools 2007 EAc1 and LEED Boundary
Schools-2009 EAc1:Optimize energy performanceposted by Greg Hackett on
Our project contains a new LEED Building (addition) and Non-LEED Building (Existing, not in LEED Boundary).
Online Template Issue - Upload Time Required for IEQp1
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Shannon Allison on
I have a technical question about LEED Online and inputting information into the Adobe Form for IEQp1.
How to show 100% Infiltration
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Kenneth Bailey on
Our project is the only development on a small, flat, island. The surface is sand or sandy topsoil and is extremely porous.
Lighting in a Assisted Living Facility
NC-2009 IEQc6.1:Controllability of systems - lightingposted by David Jennings on
I am looking at trying to reach the 90% requirement on IEQ6.1.
Capturing heat recapture for absorption dhillers
NC-2009 EAc1:Optimize energy performanceposted by Vanessa Seibert on
We are working on a college campus that will have a new central plant. We have a onsite micro turbine generators that provide power to the site.
Case 1 Option 1 - how to group rooms if identical construction?
Schools-2009 IEQp3:Minimum acoustical performanceposted by Renee Shirey on
Has anybody grouped room types for Table IEQp3-1? I am trying to understand exactly how to do this. Simplified scenario: The project has 10 small 100 SF rooms, exactly the same.
Calculation Spreadsheet
NC-2009 IEQc8.1:Daylight and views - daylightposted by Cynthia Brantley on
Does anyone have a copy of the Calculation Spreadsheet that does not require the use of macros.
Alternative Transportation
EBOM-2009 SSc4:Alternative commuting transportationposted by gwenedd murray on
I think I might know this answer but I need some advice to confirm my hunch....The project I am working on is a 5,000sf university owned educational center located 30 min from an urban area.
PV & SRECS
Schools-2009 EAc2:On-site renewable energyposted by James Geers on
If a project installs a PV system but sells a SREC for that system can it still qualify for EA c2?