Forum quick links
Moisture Protection
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Brad Buser on
I need some help understanding the moisture projection requirements of this credit.
Recyclables + Sensitive Paper Estimate?
EBOM-2009 MRc7:Solid waste management - ongoing consumablesposted by Paul C on
We recently hire a new waste hauler who uses scaled front loader trucks to collect our waste & recyclables.
Uploading Documentation
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Maya Karkour on
Hi all, When submitting documentation for this credit, through LEED Online, are we supposed to upload all the plans showing the thermal controls or can we just upload some of them (i.e.
EAp1
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Christopher Kung on
We did our in house Level 1 Walk Through in 2007 and we got the Energy Label.
Garbage disposals with on-site wastewater treatment?
Schools-2009 WEc4:Process water use reductionposted by Anya Fiechtl on
The intent for this credit is "To maximize water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems." The principal at our school was not willing to
Wellness Facility
NC-2009 IDc1:Innovation in designposted by Glenda Mayo on
We are looking for ideas for a university Wellness Facility which will house the counseling, and health services for campus students.
FM-200 (HFC-227ea) as Clean Agent Fire Suppression
NC-2009 EAc4:Enhanced refrigerant managementposted by Ted Vanderlinden on
Clean agent fire suppressant materials have no bearing on the Life Cycle Ozone Depletion calculation as they are not used as refrigerants.
Reused Metal Shelving
CI-2009 MRc3.2:Materials reuse - furniture and furnishingsposted by James Shook on
We have a library renovation project that is reusing the existing shelving in the space instead of purchasing new.
Baseline Building Envelope requirements
NC-2009 EAc1:Optimize energy performanceposted by alberto carlesi on
Hi, I'm modeling a building (not residential),for EAc1, located in climate zone 6 (winter design temperature 5°F).
Base Building for a mixed use project
NC-2009 EAc1:Optimize energy performanceposted by Graciela Carrillo on
We have a project that is a mix-used 23,000 SF bldg. The lower story is commercial (8,000 SF) and 2-stories of residential (15,000 SF).