Forum quick links
Time line for PV installation
CS-2009 EAc2:On-site renewable energyposted by Sayeed Muhammad on
In our project we intend to install PV panels for 300KWp capacity. Its a NC2009 project aiming for LEED platinum. The building is office building with a 24hrs cafeteria.
question about set of fan power in simulation program
NC-2009 EAp2:Minimum energy performanceposted by lin wang on
The fan power calculated by the formula presented in APPENDIX G3.1.2.9 of ASHREA90.1-2007 is the sum of all the fan power including supply fan,returen fan,exaust/relief fan.
Free materials
CI-2009 MRc4:Recycled contentposted by Martin O'Donnell on
Hi our company has moved to a new office and we are submitting for LEED gold.
Alternative Transporation for an inn.
EBOM-2009 SSc4:Alternative commuting transportationposted by Nana Simopoulos on
We have an inn that is seeking LEED certification. Our innkeeper lives in the building. Because we are in the center of a small town, we walk to the post office, bank and grocery store.
Finish Grading, Seeding and Plantings - applicable for MRc5?
NC-2009 MRc5:Regional materialsposted by Renee Shirey on
In the Resource book on page 383 and 385 I see tables that have "plant material" as one of the regional items, but I am confused by the language in the actual credit - "BUILDING materials or produc
FTE for residential project Case 3 of LEED CS
CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Paola Figueiredo, Newton Figueiredo on
I have a question to calculate the FTE for a residential project (2 towers in one condominium of one building).
Transportation Canopies
NC-2009 SSc7.2:Heat island effect - roofposted by Aliesa Adelman on
We have a project where caopies at an intermodal station are considered a roof system by code yet are not attached to the facility and do not fall under the LEED definition of a roof.
How to model slab-on-grade floor in simulation program
NC-2009 EAp2:Minimum energy performanceposted by lin wang on
As ASHREA90.1-2007 shown,the slab-on-grade floor of baseline building shoud be modeled by the parameter of F-factor.But the parameter to model slab-on-grade floor in program eQuest is U-value or pr
ASHRAE Mandatory Provisions for Power
NC-2009 EAp2:Minimum energy performanceposted by Carolina Vergnano on
I'm working on LEED for a stadium, and we have a bit of trouble interpreting requirements of ASHRAE 90.1 -2007 section 8. The project will have a tranformer that will filter the high voltage.
Exposed slopes
CS-2009 SSp1:Construction activity pollution preventionposted by Gabriela Hernández Castillo on
If the construction site is really "active", that is to say there is earth movement everyday and the slopes are changing every couple of days, do we need to protect them everysingle day? According