Forum quick links
M&V data reporting
NC-2009 EAc5:Measurement and verificationposted by Joseph Greene on
Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period. Are templates available for data reporting and is there a required format?
Option 2: Restrictions?
CI-2009 SSc1:Site selectionposted by on
Our project has a campus designed for 5 buildings. One building and the entire site was built out and received LEED Certified in 2004.
Biomass Boiler
NC-2009 EAc2:On-site renewable energyposted by sara frye on
Our project, a small non-profit farm house renovation, is using a wood fired biomass boiler.
Credit 3.2, Option 1, Path 2
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Douglas Blakeslee on
We are the GC for a new small (4,000 SF) Leed Certified fast food restaurant with 3,800 CFM of outside air when occupied. We plan to do our initial 3,500 CF/SF flushout over a weekend.
Phased IAQ Testing?
Schools-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Q + on
Is it acceptable to perform air quality testing in phases? The project in question is a 175K sf school designed in 7 zones.
IAQ Testing and Furnishings
Schools-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Q + on
The Credit Language contains this statement regarding air quality testing and furnishings: "Movable furnishings such as workstations and partitions should be in place for the testing, although it
Supervising the Commissioning of 20% of the energy systems
NC-2009 EAc3:Enhanced commissioningposted by Maya Karkour on
Hello, We are working on a project in which all the energy systems will be installed, tested and balanced by the general contractor.
Emission Reporting using Energy Star
EBOM-2009 EAc6:Emissions reduction reportingposted by Simon Sue on
When i click on the "select view" then to Performance :GHG emission, i can see the current total GHG emission value, but when i try to generate SEP (Statement of Energy Performance) report, the GH
EAp2 Equipment Motors
CI-2009 EAp2:Minimum energy performanceposted by Eric Claycamp on
For a LEED CI project that includes a fitness center, do you count the motors in the treadmills and cross trainers? No fitness equipment I have found is Energy Star rated.
Using as ID credit in New Construction, indoor & outdoor
EBOM-2009 MRc4:Sustainable purchasing - reduced mercury in lampsposted by Sarah Corbitt on
I'm working on a project which is using this credit as an ID credit for LEED-NC. Must outdoor lights be included?