LEED for Retail: Qualifying for Option 4 (Parking Capacity)
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by John Klein on
LEED for Retail Option 4 Path 1 states "size parking capacity must meet but not exceed minimum local zoning requirements".
Open plan (individual workstations) with access to thermostat
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Karen Stewart on
We have an open plan office area that contains 24 workstations. There are 3 thermostats that control the temperature in this open office plan area.
Grouping of spaces
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Anupam Jain on
I am working on a project with similar spaces repeating on each floor. I know LEED allows one to group spaces in some credits.
Can a PC count for Campus?
Pilot-Credits PC41:Wastewater Managementposted by Prudence Ferreira on
If we were to certify a campus EBOM project and we pursued this credit for a campus wastewater treatment facility would this PC gain a point for each building that used the wastewater treatment cen
AASHE STARS / Climate Action Plan - Master Site Innovation
NC-2009 IDc1:Innovation in designposted by M. Elbaum on
Any thoughts if an AASHE STARS rating for a college campus will earn you a Master Site Innovation credit? What about being an ACUPCC signatory and having a Climate Action Plan? These would be two
Weighted average for new construction + major renovation?
NC-2009 EAc1:Optimize energy performanceposted by Bethany Beers on
We are performing a review of an energy model for a project that is a major remodel of an existing space with addition of new square footage.
A & B bus lines - do they count separately?
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Jill Ziegler on
We are going for Exemplary Performance since we have 5 qualifying bus lines. Total (weekday) stops equals exactly 200, so we're good there.
Phase I for an Existing School
Schools-2009 SSp2:Environmental site assessmentposted by John McFarland on
Do we need a formal Phase I assessment for a school remodeling project (major renovation)? The school site was a greenfield site when it was originally constructed approximately 50 years ago.
Compliance if there are no fixtures on the design
CS-2009 WEc3:Water use reductionposted by Jose Salinas on
Hi, The Owner is constructing a tower with high end tenants on the his scope.
Cost of Renewable Energy
NC-2009 EAc1:Optimize energy performanceposted by Gregg Achtenhagen on
I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.