Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bike Racks for a Movie Theater - SSc4.2

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Nilo Regojo  on 

Is it reasonable to propose bike racks for less than 5% of peak-time building users for a new Movie Theater?

1
Tue Jul 5, 2011, 10:02 pm

What about shared Multi-Occupant spaces that are not classrooms?

Schools-2009 IEQc6.1:Controllability of systems - lighting
posted by  Grace Heicher  on 

Following Case 1, the LEED Reference Guide requires individual lighting controls in spaces occupied by individuals, and also adjustable controls for all learning spaces.

1
Tue Jul 26, 2011, 12:12 am

Showing energy savings in drug manufacturing facilities

NC-2009 EAc1:Optimize energy performance
posted by  CRB Sustainability  on 

Has anyone performed an exceptional alculation to demonstrate energy savings in a drug manufacturing facility for EAc1?

0

Demolition debris / Land-clearing debris

CS-2009 MRc2:Construction waste management
posted by  Petra Hajná  on 

What is the difference between these two categories? Demolition debris counts towards waste management and land-clearing doesn't.

1
Tue Nov 8, 2011, 8:07 pm

Construction dates of bicycle networks

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Carrie Johansen  on 

It seems like this information may not be readily available for many bicycle networks. Has anyone else had difficulty finding information regarding bicycle network construction dates?

1
Mon Nov 7, 2011, 10:16 pm

Building Envelope Requirements for Continuous Insulation

NC-2009 EAc1:Optimize energy performance
posted by  Myra Villalobos  on 

We have a project that has structural masonry walls, and interior steel studs. Appendix G requires 7.5 c.i. for our walls, so I have two questions: 1.

1
Tue Jul 19, 2011, 7:27 pm

Absorption Chiller - District Heating

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Ralf Lehmann  on 

In my project there is an absorption chiller supplied by district heating. The building itself is also heated by district heating.

1
Tue Jul 5, 2011, 6:47 pm

More LCA Score Questions

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials
posted by  Dirk Kestner  on 

Were Laura’s questions from April 7th ever resolved? I just input some data for a new project and am also getting a score over 100.

0

How to document glare control w/ prescriptive method?

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Bonnie Chiu  on 

I am documenting all the rooms in the building using the prescriptive method and I've checked the box that says 'the project has incorporated appropriate glare control devices...' in the credit for

1
Sat Jul 9, 2011, 4:18 am

Ground-Mounted Solar PV Arrays

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  J Douglas Dietrich  on 

If there is an open space with (1) a ground-mounted solar PV array and (2)native plantings or adapted vegetation beneath the PV panels and around them so as not to block sunlight, would the area be

1
Wed Jul 27, 2011, 9:50 pm