Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Floated tile paving and Heat Island Effect

EBOM-2009 SSc7.2:Heat island effect - roof
posted by  Mauricio Ramirez  on 

I have a building that has in the most part of their roof, a floating tile paving, that creates an air-chamber between the slab of the roof and the tilies of the paving.

1
Fri Sep 2, 2011, 2:15 pm

Percentage of finished floor complying for the credit

Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Dario Ibarguengoitia  on 

MY QUESTION IS.. WHAT IF I JUST HAVE 25 % OF THE FINISHED FLOOR AREA USING LOW EMITTING OR CERTIFIED PRODUCTS, AM I STILL EARNING THE CREDIT?

1
Sun Jul 24, 2011, 4:40 am

Calculator

EBOM-2009 EAc1:Optimize energy efficiency performance
posted by  Austin Evans  on 

In the Case 2 Option 2 tab for the offline calculator the cells are locked up on the option III enter current year EUI score as far as I can tell.

1
Wed Oct 5, 2011, 3:41 pm

Gross Lighted Area - ASHRAE 90.1-2007

CI-2009 EAc1.1:Optimize energy performance - lighting power
posted by  Trevor Karstens  on 

This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways: I'm encountering difficulty in documenting the minimum 10% light

1
Wed Aug 17, 2011, 2:57 pm

Reference building - garage

CS-2009 EAc1:Optimize energy performance
posted by  Adam Targowski  on 

In the building for which I'm preparing energy simulation, there's an underground garage which is heated only by used recirculated air from offices above.

1
Fri Jul 8, 2011, 2:52 pm

ASHRAE compliance with naturally ventilated building

NC-2009 EAc1:Optimize energy performance
posted by  Jean Marais  on 

As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally ventilat

0

Distribution and Vintage of REC's purchased in a Portfolio

NC-2009 EAc6:Green power
posted by  Eric Elizondo  on 

Our client is a national banking program that has purchased REC's as a corporation in 2010 and 2011 as part of a corporate portfolio program.

1
Wed Sep 7, 2011, 11:41 pm

Applicable for On-Site Renewable credit?

NC-2009 EAc2:On-site renewable energy
posted by  Jeff H.  on 

My company is considering a geothermal system for an industrial facility.

1
Sun Sep 4, 2011, 2:43 am

SS 1 Option 2 Path 9

CI-2009 SSc1:Site selection
posted by  Augusto Velazquez   on 

I am having trouble filling out the LEED Online template for option 9.

1
Thu Aug 11, 2011, 5:53 pm

why do we need to model heating if we have none

NC-2009 EAp2:Minimum energy performance
posted by  Alicia Villanueva  on 

I am working in projects in Mexico and it has been a challenge to model heating when we have none. Sometime when modeling heating comes out higher in the proposed design than in the baseline and t

1
Tue Jul 19, 2011, 6:00 pm