Forum quick links
Instantaneous and/or totalized
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by James Gray on
For natural gas metering applications, is continuous logging of instantaneous flows a requirement? Most meters just put out totalized pulses, so I'm assuming that's fine... Any thoughts?
Designated smoking area in a loading dock
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Jessica Jones on
Can you please comment on whether the following approach would be acceptable to achieve this prerequisite: A project building is attached to a loading dock on the property, and the designated smok
Floated tile paving and Heat Island Effect
EBOM-2009 SSc7.2:Heat island effect - roofposted by Mauricio Ramirez on
I have a building that has in the most part of their roof, a floating tile paving, that creates an air-chamber between the slab of the roof and the tilies of the paving.
Percentage of finished floor complying for the credit
Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Dario Ibarguengoitia on
MY QUESTION IS.. WHAT IF I JUST HAVE 25 % OF THE FINISHED FLOOR AREA USING LOW EMITTING OR CERTIFIED PRODUCTS, AM I STILL EARNING THE CREDIT?
Calculator
EBOM-2009 EAc1:Optimize energy efficiency performanceposted by Austin Evans on
In the Case 2 Option 2 tab for the offline calculator the cells are locked up on the option III enter current year EUI score as far as I can tell.
Gross Lighted Area - ASHRAE 90.1-2007
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Trevor Karstens on
This topic was previously posted under EAp2, but was not getting any responses; this seems like the more relevant location anyways: I'm encountering difficulty in documenting the minimum 10% light
Reference building - garage
CS-2009 EAc1:Optimize energy performanceposted by Adam Targowski on
In the building for which I'm preparing energy simulation, there's an underground garage which is heated only by used recirculated air from offices above.
ASHRAE compliance with naturally ventilated building
NC-2009 EAc1:Optimize energy performanceposted by Jean Marais on
As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally ventilat
Distribution and Vintage of REC's purchased in a Portfolio
NC-2009 EAc6:Green powerposted by Eric Elizondo on
Our client is a national banking program that has purchased REC's as a corporation in 2010 and 2011 as part of a corporate portfolio program.
Applicable for On-Site Renewable credit?
NC-2009 EAc2:On-site renewable energyposted by Jeff H. on
My company is considering a geothermal system for an industrial facility.