Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SS 1 Option 2 Path 9

CI-2009 SSc1:Site selection
posted by  Augusto Velazquez   on 

I am having trouble filling out the LEED Online template for option 9.

1
Thu Aug 11, 2011, 5:53 pm

why do we need to model heating if we have none

NC-2009 EAp2:Minimum energy performance
posted by  Alicia Villanueva  on 

I am working in projects in Mexico and it has been a challenge to model heating when we have none. Sometime when modeling heating comes out higher in the proposed design than in the baseline and t

1
Tue Jul 19, 2011, 6:00 pm

How many CO2 sensors are required per space?

CS-2009 IEQc1:Outdoor air delivery monitoring
posted by  William Wong  on 

Credit requires to monitor CO2 level for densely occupied spaces. Is there any requirements for the minimum no. of sensors per space / sq ft?

1
Mon Nov 21, 2011, 4:20 am

calculation assumptions

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials
posted by  Susan Walter  on 

Now that we're digging into the credit, we have questions on the assumed thickness for items that are a SF input.

0

Green Advantage Innovation Credit for 2009 BD&C & NC v2.2

NC-2009 IDc1:Innovation in design
posted by  liz boastfield  on 

Projects staffed with 30% or more of key personnel certified through Green Advantage are now eligible for award of 1 Innovation point.

0

Total Cost of Materials

NC-2009 MRc4:Recycled content
posted by  J Morrison  on 

The LEED Online format for submitting the MR credit 4, 5, and 7 it asks for the "Cost per Item" and "Number of Items Purchased". I have to total cost of the items, but not the individual cost.

1
Tue Jul 26, 2011, 9:14 pm

Energy Modeling

CS-2009 EAp2:Minimum energy performance
posted by  Yolanda Sanchez  on 

In a LEED CS 2009 building energy simulation we are modeling the building envelope to test performance (only the building envelope).

1
Wed Sep 28, 2011, 2:10 am

HVAC System

CS-2009 EAc4:Enhanced refrigerant management
posted by  Yolanda Sanchez  on 

HVAC for the whole building is in the process of being designed (VRF system).

1
Mon Nov 21, 2011, 6:12 am

HangarGrip Adhesive

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Elizabeth Powers  on 

The product in question is the Eco Hanger Grip Adhesive from MEI, described as "a construction-type paste adhesive specially designed for bonding insulation hangers to metal ducts and unfinished ma

1
Mon Jul 18, 2011, 5:23 pm

Scheduling for CS

CS-2009 IEQc3:Construction IAQ management plan - during construction
posted by  BH .  on 

Dear all, we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of IAQ management plan in scheduling point?

1
Mon Nov 21, 2011, 3:30 am