Forum quick links
HVAC System
CS-2009 EAc4:Enhanced refrigerant managementposted by Yolanda Sanchez on
HVAC for the whole building is in the process of being designed (VRF system).
HangarGrip Adhesive
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Elizabeth Powers on
The product in question is the Eco Hanger Grip Adhesive from MEI, described as "a construction-type paste adhesive specially designed for bonding insulation hangers to metal ducts and unfinished ma
Scheduling for CS
CS-2009 IEQc3:Construction IAQ management plan - during constructionposted by BH . on
Dear all, we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of IAQ management plan in scheduling point?
Are garage areas counted?
EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Paola Figueiredo, Newton Figueiredo on
To whom it may concern, I have a question that I did not find a solution to in the LEED EBOM Reference Guide or in the credit-by-credit forum on this website. In the audit that will be made in the
Pilot LEED Credit for verification of recycling
Pilot-Credits PC43:Certified Productsposted by Jeff Jones on
I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an EBOM operation.
third-party verification of landfill diversion docs (re-post)
NC-2009 MRc2:Construction waste managementposted by Jeff Jones on
I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an EBOM operation.
Time Committment on Option 1 - Provide Spaces
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Cynthia Estrada on
Is anyone aware of a time committment on providing LE/FEV Spaces for this credit? The Owner of our project posed the question since the Discounted Parking rate has a minimum of 2 years.
Daylighting
CI-2009 IEQc6.1:Controllability of systems - lightingposted by Sam Keehn on
Daylighting is mentioned as a method for meeting the credit requirement of a lighting control. Our project is an open plan with a small number of work stations all within 20 feet of the window.
Sharing Waste Bins
CS-2009 MRc2:Construction waste managementposted by Elizabeth Durney on
Hello We have a project that is attempting LEED-CS certification. A tenant in the same building is simultaneously attempting LEED-IDC certification.
Building Over Hang
CI-2009 EAp2:Minimum energy performanceposted by Simon Sue on
We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.