Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

HVAC System

CS-2009 EAc4:Enhanced refrigerant management
posted by  Yolanda Sanchez  on 

HVAC for the whole building is in the process of being designed (VRF system).

1
Mon Nov 21, 2011, 6:12 am

HangarGrip Adhesive

NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Elizabeth Powers  on 

The product in question is the Eco Hanger Grip Adhesive from MEI, described as "a construction-type paste adhesive specially designed for bonding insulation hangers to metal ducts and unfinished ma

1
Mon Jul 18, 2011, 5:23 pm

Scheduling for CS

CS-2009 IEQc3:Construction IAQ management plan - during construction
posted by  BH .  on 

Dear all, we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of IAQ management plan in scheduling point?

1
Mon Nov 21, 2011, 3:30 am

Are garage areas counted?

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by  Paola Figueiredo, Newton Figueiredo  on 

To whom it may concern, I have a question that I did not find a solution to in the LEED EBOM Reference Guide or in the credit-by-credit forum on this website. In the audit that will be made in the

1
Tue Nov 15, 2011, 2:58 pm

Pilot LEED Credit for verification of recycling

Pilot-Credits PC43:Certified Products
posted by  Jeff Jones  on 

I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an EBOM operation.

1
Mon Jul 25, 2011, 10:17 pm

third-party verification of landfill diversion docs (re-post)

NC-2009 MRc2:Construction waste management
posted by  Jeff Jones  on 

I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an EBOM operation.

1
Mon Jul 25, 2011, 11:11 pm

Time Committment on Option 1 - Provide Spaces

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Cynthia Estrada  on 

Is anyone aware of a time committment on providing LE/FEV Spaces for this credit? The Owner of our project posed the question since the Discounted Parking rate has a minimum of 2 years.

1
Sun Sep 4, 2011, 3:09 am

Daylighting

CI-2009 IEQc6.1:Controllability of systems - lighting
posted by  Sam Keehn  on 

Daylighting is mentioned as a method for meeting the credit requirement of a lighting control. Our project is an open plan with a small number of work stations all within 20 feet of the window.

1
Tue Jul 26, 2011, 12:29 am

Sharing Waste Bins

CS-2009 MRc2:Construction waste management
posted by  Elizabeth Durney  on 

Hello We have a project that is attempting LEED-CS certification. A tenant in the same building is simultaneously attempting LEED-IDC certification.

1
Tue Nov 8, 2011, 8:55 pm

Building Over Hang

CI-2009 EAp2:Minimum energy performance
posted by  Simon Sue  on 

We working on a commercial bank and calculating the installed LPD in the project space. The commercial bank has a overhang on the 1st floor and is included in our LEED boundary.

1
Fri Jul 22, 2011, 9:00 pm