Asphalt Roll Roof Recycling
CI-2009 MRc2:Construction waste managementposted by Sabrina B on
I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.
CI on site Green Power?
CI-2009 EAc4:Green powerposted by Robin Hurt on
Is it possible to install onsite renewable energy that met the energy production requirements for energy usage of CI EA4 in lieu of purchasing Green Power?
Hi, I have a project in the
EBOM-2009 WEc3:Water efficient landscapingposted by matthew strong on
Hi, I have a project in the NY zip code 10589 that has two types of irrigation: 1. Unmetered irrigation by retention pond for 58,094 SF of lawn and trees along the driveway 2.
M&V- energy costs paid by tenant
CI-2009 EAc3:Measurement and verificationposted by Sarah Marvez on
Our project occupies
PV Watts for other countries?
NC-2009 EAc2:On-site renewable energyposted by Nelina Loiselle on
Help Please!
Foyer as occupided or unnocupied space
NC-2009 IEQc8.2:Daylight and views - viewsposted by marisol cano on
Hello, Anybody knows if a Foyer in a Hotel (mainly a hall to access 3 meting rooms with a "coffe and cookies" table for the meeting room users) would count as occupied space?
LEED CI 2004, Credit 1.1 Optimize Energy Performance
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by David Rodriguez on
When reviewing the CI forms from an older project that were filled out by a consultant, I noticed they had taken 10% credit towards the installed lighting power for occupancy sensor control of ligh
Roll-out Mats
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Caroline O'Leary on
As I'm writing an e-mail to a client regarding the requirements for roll-out mats to meet LEED requirements, I'm questioning the following - if we have walk-off carpet installed over the entire Lob
Exemplary Performance
CI-2009 SSc3.1:Alternative transportation - public transportation accessposted by Sheela I on
I am currently working on a project which has 1 train station stop @ 0.2 miles (walkable distance) and 4 bus stops with in 0.2 mile (walkable distance) to the project site.
The tenant sales and lease agreement - Lighting
CS-2009 SSc9:Tenant design and construction guidelinesposted by John Harrington on
Does anyone know if the developer/owner can specifiy a requirement for a tennant to design lighing Power Density (%5) or more below ANSI/ASHRAE/IESNA Standard 90.1-2007 - Table 9.6.1 Lighting Pow