Forum quick links
Changes in Daylighting requirements from v2
EBOM-2009 IEQc2.4:Daylight and viewsposted by bayard fenwick on
I am working on a project that was certified under LEED EB v2.
Tenant Lease Agreement
CS-2009 SSc9:Tenant design and construction guidelinesposted by Udana Ratnayake on
what are the LEED specific information that should be included in a tenant lease agreement? is it required to include all credits mentioned under case A,B & C of LEED NC rating system?
Landscape lighting
NC-2009 EAc1:Optimize energy performanceposted by Julien Daclin on
Appendix G (Table 3.1) states that lighting power for building facades has to be modeled in the energy simulation.
DES and required Leakage Rate Calculations
NC-2009 EAp3:Fundamental refrigerant managementposted by Brooks Critchfield on
I have a project on a looped DES with a couple of non-compliant CFC-chillers upstream/on the same loop. A 3rd-party audit has determined that phase-out is not economically beneficial in 10-years o
ETS Req. rental apartment building by % Smoking % No Smoking
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Rob Hink on
Can an apartment rental project meet the requirement of IEQp2 if they designate a percentage of rental apartments as smoking?
Landscape lighting
CS-2009 EAc1:Optimize energy performanceposted by Julien Daclin on
Appendix G (Table 3.1) states that lighting power for building facades has to be modeled in the energy simulation.
Paints and coating applied off site
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Petra Hajná on
According to credit language, does it mean, that paints and coatings not applied on site (steel structure painted somewhere elese - in a workshop) do not need to be evaluated?
Doubt
CS-2009 EAp2:Minimum energy performanceposted by Redy Truccolo on
Hi, I'm doing a LEED CS 2009 PRE-certification. My question is: In the "Upload L-4" section, which states: Provide a detailed narrative describing the intended credit approach, including energy ef
View outside vision glazing, LEED CI 2.0 project.
CI-2009 IEQc8.2:Daylight and views - viewsposted by Rubén M. R. on
Hi all, Since I couldn't find a LEED CI 2.0 forum, I allow myself to write here (my apologies): The vision of a multi-occupant office goes directly to a terrace which has a high wall located 10
Min Airflow in Intermittent Occupancy Spaces
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Rick Servoss on
We received a comment back on a CI project stating: "Demonstrate the system serving the special occupancy space is capable of modulating system and zone minimum supply volume below 0.30 cubic feet