Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

View outside vision glazing, LEED CI 2.0 project.

CI-2009 IEQc8.2:Daylight and views - views
posted by  Rubén M. R.  on 

Hi all, Since I couldn't find a LEED CI 2.0 forum, I allow myself to write here (my apologies): The vision of a multi-occupant office goes directly to a terrace which has a high wall located 10

1
Mon Nov 21, 2011, 3:54 am

Min Airflow in Intermittent Occupancy Spaces

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Rick Servoss  on 

We received a comment back on a CI project stating: "Demonstrate the system serving the special occupancy space is capable of modulating system and zone minimum supply volume below 0.30 cubic feet

1
Wed Nov 23, 2011, 3:55 pm

Long Term Commitment

CI-2009 MRc1.1:Tenant space - long-term commitment
posted by  Tiago e Silva  on 

I got I bit confused with the period of time which is considered to comply with the aim of this credit. At first a thought the 10 year commitment counted from the date of the LEED certification pr

1
Sun Dec 18, 2011, 5:41 am

FTE for Schools

Schools-2009 WEc3:Water use reduction
posted by  David Mirabile  on 

When calculating the FTE's, what is typically done for summer months when school is not is session?

1
Mon Nov 7, 2011, 5:12 pm

LEED Pressure Adjustment for Lab HVAC-Systems

CS-2009 EAc1:Optimize energy performance
posted by  heinrich post  on 

Seems that some of my questions are not easy to answer. Here is another question for the same lab project. Fan system Power limitations are calculated according to Table 6.5.3.1.1A of ASHRAE 90.1-

1
Wed Oct 19, 2011, 5:07 pm

hardfill

Schools-2009 MRc2:Construction waste management
posted by  Eri Spaulding  on 

In one of our projects, most of the construction waste (especifically concrete and masonry) has been used as hardfill in land outside this project, in a location where other construction will take

1
Tue Nov 8, 2011, 7:50 pm

Exterior Wall Defintion for EA Credits

NC-2009 EAp2:Minimum energy performance
posted by  Miranda Gardiner  on 

I have a general code question regarding when a wall is considered interior and when it is considered exterior, as our team has looked for clear language in the NYS energy code as well as the ASHRA

1
Mon Sep 19, 2011, 5:35 pm

Cost to be Excluded in the total proj material costs for MR CR3

NC-2009 MRc3:Materials reuse
posted by  Benjie Herrera  on 

I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc.

1
Wed Sep 21, 2011, 4:29 pm

Ventilation for storage an mechanical rooms

Schools-2009 IEQp1:Minimum indoor air quality performance
posted by  Rodrigo Ubilla  on 

Dear experts, We are working on a university building wich has 2 underground floors, with mechanical and storage rooms in them, all these rooms are adjacent to the stairs.

1
Sat Nov 19, 2011, 3:32 pm

Pilot Credit Content?

Pilot-Credits EQpc22:Interior lighting - quality
posted by  Jonathan Weiss  on 

The content listed here on this page differs from the current content on the USGBC website - they have a similar but different set of requirements listed. Which one is currect?

1
Sun Nov 13, 2011, 5:25 am