Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Landscape lighting

CS-2009 EAc1:Optimize energy performance
posted by  Julien Daclin  on 

Appendix G (Table 3.1) states that lighting power for building facades has to be modeled in the energy simulation.

1
Wed Sep 14, 2011, 1:17 pm

Paints and coating applied off site

CS-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Petra Hajná  on 

According to credit language, does it mean, that paints and coatings not applied on site (steel structure painted somewhere elese - in a workshop) do not need to be evaluated?

1
Wed Sep 14, 2011, 12:33 pm

Doubt

CS-2009 EAp2:Minimum energy performance
posted by  Redy Truccolo  on 

Hi, I'm doing a LEED CS 2009 PRE-certification. My question is: In the "Upload L-4" section, which states: Provide a detailed narrative describing the intended credit approach, including energy ef

1
Wed Oct 26, 2011, 7:24 pm

View outside vision glazing, LEED CI 2.0 project.

CI-2009 IEQc8.2:Daylight and views - views
posted by  Rubén M. R.  on 

Hi all, Since I couldn't find a LEED CI 2.0 forum, I allow myself to write here (my apologies): The vision of a multi-occupant office goes directly to a terrace which has a high wall located 10

1
Mon Nov 21, 2011, 3:54 am

Min Airflow in Intermittent Occupancy Spaces

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  Rick Servoss  on 

We received a comment back on a CI project stating: "Demonstrate the system serving the special occupancy space is capable of modulating system and zone minimum supply volume below 0.30 cubic feet

1
Wed Nov 23, 2011, 3:55 pm

Long Term Commitment

CI-2009 MRc1.1:Tenant space - long-term commitment
posted by  Tiago e Silva  on 

I got I bit confused with the period of time which is considered to comply with the aim of this credit. At first a thought the 10 year commitment counted from the date of the LEED certification pr

1
Sun Dec 18, 2011, 5:41 am

FTE for Schools

Schools-2009 WEc3:Water use reduction
posted by  David Mirabile  on 

When calculating the FTE's, what is typically done for summer months when school is not is session?

1
Mon Nov 7, 2011, 5:12 pm

LEED Pressure Adjustment for Lab HVAC-Systems

CS-2009 EAc1:Optimize energy performance
posted by  heinrich post  on 

Seems that some of my questions are not easy to answer. Here is another question for the same lab project. Fan system Power limitations are calculated according to Table 6.5.3.1.1A of ASHRAE 90.1-

1
Wed Oct 19, 2011, 5:07 pm

hardfill

Schools-2009 MRc2:Construction waste management
posted by  Eri Spaulding  on 

In one of our projects, most of the construction waste (especifically concrete and masonry) has been used as hardfill in land outside this project, in a location where other construction will take

1
Tue Nov 8, 2011, 7:50 pm

Exterior Wall Defintion for EA Credits

NC-2009 EAp2:Minimum energy performance
posted by  Miranda Gardiner  on 

I have a general code question regarding when a wall is considered interior and when it is considered exterior, as our team has looked for clear language in the NYS energy code as well as the ASHRA

1
Mon Sep 19, 2011, 5:35 pm