producer declaration

CS-2009 MRc4:Recycled content
posted by  Agnieszka Rylska  on 

We received a declaration from a material producer stating that the product "contains ca. 80% recycled content" and "we assume that 50% comes from post-consumer".

1
Fri Jul 1, 2016, 2:30 am

Minimum Energy performance Calculator

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings, We have a project, which is registered upon LEED-NC v2009, with unit type SI. The online form of EAp2 has a new form, which is directing us to upload the Minimum Energy Performance Calcu

1
Thu Jan 19, 2017, 3:32 pm

Locker rooms

CI-2009 IEQc1:Outdoor air delivery monitoring
posted by  Agnieszka Rylska  on 

Are CO2 sensors required in locker rooms? Loker rooms are non-regularly occupied spaces but they are also densely-occupied spaces.

1
Sat Aug 26, 2017, 10:50 pm

Petrol contamination

NC-2009 SSc3:Brownfield redevelopment
posted by  Alicja Bieszyńska  on 

My project site is located next to one of the main arteries of Warsaw. Due to the high trafic the strip adjacent to the road is contaminated with petrol related substances (not much but still).

1
Wed Jan 28, 2015, 9:33 pm
1
Mon Aug 31, 2015, 1:57 pm

parking demand vs 1000sf or vs employees

General forums
posted by  Agnieszka Rylska  on 

We are working on a project that is a warehouse.

1
Tue Jun 14, 2016, 1:55 am

Commissioning of DATA Centers

Data-Centers-NC-v4 EAc1:Enhanced commissioning
posted by  Vassil Vassilev  on 

Greetings, There is a question from the Owner of Data center in respect of the forth comming commissioning process for his project. The question is related to the specific IT equipment and the spec

1
Tue Aug 29, 2017, 4:34 pm

IEQp1-tenant spaces

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  Agnieszka Rylska  on 

We are working on a shopping mall project in whcih there will be many retail spaces. Some of the tenants will design their own ventilation systems and provide their own AHUs.

1
Mon Jan 23, 2017, 3:15 pm

Use of C&S Commissioning documentation

EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysis
posted by  Izabela Kwiecinska  on 

Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.

1
Fri Feb 10, 2017, 8:56 pm

Heating only system; Baseline modeling of DHW

NC-2009 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Markus, thanks a lot for your answer. Another issue appeared to this Heating only system - Baseline modeling of DHW (Domestic Hot Water). The Proposed model is having a gas fired boiler to provide

1
Thu Oct 23, 2014, 3:11 pm