NC-2009 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings, We have a project, which is registered upon LEED-NC v2009, with unit type SI. The online form of EAp2 has a new form, which is directing us to upload the Minimum Energy Performance Calcu
Locker rooms
CI-2009 IEQc1:Outdoor air delivery monitoringposted by Agnieszka Rylska on
Are CO2 sensors required in locker rooms? Loker rooms are non-regularly occupied spaces but they are also densely-occupied spaces.
Heating only system; Baseline modeling of DHW
NC-2009 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Markus, thanks a lot for your answer. Another issue appeared to this Heating only system - Baseline modeling of DHW (Domestic Hot Water). The Proposed model is having a gas fired boiler to provide
Glazing cover of parking area
NC-2009 SSc7.1:Heat island effect - nonroofposted by Nina Starynina on
Hi, The project has a covered parking. The Owner is chosing the cover material and considers to implement glazing for the cover (SRI value is 30, SHGC is 50).
LCA Part C – End of Life
NC-v4 MRc1:Building life-cycle impact reductionposted by Petr Vogel on
The credit says cradle to grave so it is obvious that this part has to be included. Is there any guidance how should it be included?
IEQp1-tenant spaces
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Agnieszka Rylska on
We are working on a shopping mall project in whcih there will be many retail spaces. Some of the tenants will design their own ventilation systems and provide their own AHUs.
Use of C&S Commissioning documentation
EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysisposted by Izabela Kwiecinska on
Hi Everyone, We are working on a building that already got LEED C&S certificate in 2012 and now aims to get EBOM.
n/a
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Anastasia Makarenko on
Hello all, I am confused how to identify one product that is going to be used on a concrete slab inside our project building.
Precertification credits online
CS-2009 WEc3:Water use reductionposted by Jakub Netolicky on
Hello, at the moment we are doing precertification, when I want to attemt some credits on website LEEDonline, some credits remain 0, therefore, we have only few points in total.
Notes under table in LEED credit form
NC-2009 EAc4:Enhanced refrigerant managementposted by Patryk Marciniszyn on
Hi all, under the table in LEED credit form there is a note: Average refrigerant impact per kW must be less than or equal to 13 for 2 points. Does it mean that I won't get 2 points for having av