Forum quick links
Documentation required
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
Our project is a 26-storey building located in Mexico City with more than 20 tenants. The HVAC consists of AHUs and VAV-boxes with recirculation at the AHU.
LEED Form MR 4
NC-2009 MRc4:Recycled contentposted by juan pena on
The assembly as % of product section found in the MR 4 form is already prefilled with 100% for all materials. Is this correct?
Role
posted by Gustavo De las Heras Izquierdo on
Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant? Our experience outside the
Existing Buildings
Pilot-Credits EQpc78:Design for active occupantsposted by Rubén M. R. on
This pilot credit is an incentive for existing building owners to plan a renovation of unused stairs.
% of Glazing & Floor Area Base Case vs Project
CS-2009 EAp2:Minimum energy performanceposted by Dana Guzman on
Hi, I am new to LEED and looking at the energy model submitted by our consultant for the compliance on EAp2. I have a basic question.
Demonstrate Savings for CRAC Units
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Gabriela Crespo on
Dear all, Same project as before, Central Chilled Water System, not in our scope. The only HVAC equipment in our scope are 2 CRAC units for the office's SITES.
Paints Low Emissions
CI-v4 EQc2:Low-emitting materialsposted by Gabriela Mena on
Hi, We have a CI project in Mexico, we are specifying a National paints trade and the certification for VOC is the standard ASTM D 3960, which is not in the list of third party certifications acc
LEED O&M on a portion of a building
EBOM-v4 MPR3:Must comply with project size requirementsposted by LEED Pro Consultant on
Would a CI project (not LEED) that complies with the MPR's but consists of only a portion of a building (5 levels) be elegible for a LEED O&M certification?
Exterior space, partially enclosed - Application of Std.
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Mauricio Ramirez on
Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.
Product type classification
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Raquel Ortiz on
Hello, I have a project where a Stonhard flooring system will be installed, like a terrazzo floor characteristics, The system has a hardener for two components coating and a quartz aggregate, the