Forum quick links
Setback requirement
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
Hi,
We are working on an office building where some private offices are served by split system. How does the setback requirement is met on these specific HVAC system?
Ventilation in Corridors
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sofia Barahona on
We have a question regarding the ventilation requirements on corridors in order to comply with requirements of Minimum Indoor Air Quality Performance prerrequisite.
recyclable storage area outside the boundary
NC-v4 MRp1:Storage and collection of recyclablesposted by Larissa Murakami on
Would it be possible to use an area outside the boundary for the recyclable storage area?
Manufacturing Plant Energy Consumption
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are working on a project that is pursuing LEED v4: New Construction.
Control monitoring in tenant spaces
CS-v4 EQp1:Minimum indoor air quality performanceposted by Ron Dean on
Hello,
MRc2
NC-2009 MRc2:Construction waste managementposted by Victoria Rios Esteve on
Hi! We have a building in the process of certification which changed its initial contractor to another company.
Mandatory Provision for Lighting Controls C&S
CS-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are currently working on a LEED Core and Shell v4 office building on Santiago, Chile.
Base Building HVAC Systems
CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi,
I am modeling one floor of a 31 story building, I would like to verify the following:
Core and Shell not for rental?
posted by Victoria Rios Esteve on
Hi everyone,
Core and Shell not for rental?
NC-v4.1 IPc1:Integrative Processposted by Victoria Rios Esteve on
Hi everyone,