Forum quick links
Strategy to fulfill the pilot credit Quality views in non regularly occupied spaces
NC-v4 EQc8:Quality viewsposted by Angela Atehortua on
In a Project that we are advising that consists of an Innovation building for a University, we are aiming to achieve this pilot loan by implementing two main strategies, the first is that all space
renewing the certification
Retail-CI-v4 EAc6:Green power and carbon offsetsposted by Raissa Petri on
Regarding the following:
Option 3. design for flexibility- Acessible ceiling system
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lara Branco on
The project I'm working on will leave all the ceiling infrastructure apparent, without the use of ceiling tiles (except a few acoustic panels). Therefore all the lighting, plumbing, etc.
Construction Phases
Hospitality-NC-v4 MPR1:Must be in a permanent location on existing landposted by Larissa Murakami on
We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.
IEQp1 - calculator
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by sebastian castañeda on
My greetings I am working through In the IEQp1 Minimum Indoor air quality performance and I need orientation with respect to systems with natural ventilation. I need to know if exists a calculator
Process Loads
NC-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hello,
I am modeling a winery and some of the chillers participate only to chilled and heat wine tanks.
Natural Ventilation Procedure - Prescriptive Path 62.1 2010
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
materials not used in the original construction are verified in the re-evaluation of the certification?
posted by ANDREZA PASSOS on
I would like to know if Unused Materials, when purchased by the company along with the LEED guidelines, can cause owners to lose certification during the renewal evaluation of the certificate?
Consumption of hotel guests in common areas
NC-2009 WEp1:Water use reductionposted by Gabriela Mesquita on
We have a Hotel Project in Paraguay. We have sent the Project documentation and the reviewers have made an observation regarding the Water Use Reduction Calculation.