Forum quick links
Multiple Building HVAC system
posted by Paula Hernandez on
Hello, We have two buildings in the same Project boundary, as far as I understand, this would be a Group Building Certification. The HVAC system will be variuous VRF systems, each for each floor of
LEED v3 2009 certification in 2018
posted by Vanessa Montezuma Ramos on
Hi everyone, I just started the certification of a laboratory building on LEED v3 2009.
Non Local Supplier
CS-2009 MRc6:Certified woodposted by Carol Muñoz on
Hi, We have a non local supplier.
Lighting Power Density requirement for Tenant spaces
CS-2009 EAp2:Minimum energy performanceposted by Pedro Urazan on
Hi, Is it required that the Tenants comply in their lighting designs with the Lighting Power Density requirement of ASHRAE 90.1 2007?
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
a one-family House can be LEED EBOM?
EBOM-2009 PIf2:Project Summary Detailsposted by Alan Viale on
Hi, we have a house for one-family with the interest to be a LEED EBOM. is this possible? all the credits which require measurement, verification, or following can be responsible of the family o
n/a
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).
Documenting the Pilot Credit with International Standards
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Cesar Ruiz on
My project is located in Colombia and I had some trouble finding information about the possibility of using Standards from outside the US in the documentation of the Pilot Credit 44: Ergonomics Str
Existing Building Commissioning
EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysisposted by sebastian castañeda on
Hello. I am a student who is interested in learning about the methodology of LEED certification and there are some points that I do not clear.