Forum quick links
Dist. Center - Light polution
Warehouses-NC-v4 SSc6:Light pollution reductionposted by Antonio Macedo Filho on
If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?
Window-sill
NC-v4 EQc8:Quality viewsposted by Antonio Macedo Filho on
I would like to know if there is a maximum obstruction height of views for option 1.
a one-family House can be LEED EBOM?
EBOM-2009 PIf2:Project Summary Detailsposted by Alan Viale on
Hi, we have a house for one-family with the interest to be a LEED EBOM. is this possible? all the credits which require measurement, verification, or following can be responsible of the family o
n/a
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
Dear all, We are working on a mall with natural ventilation on the common areas (corridors).
Documenting the Pilot Credit with International Standards
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Cesar Ruiz on
My project is located in Colombia and I had some trouble finding information about the possibility of using Standards from outside the US in the documentation of the Pilot Credit 44: Ergonomics Str
Existing Building Commissioning
EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysisposted by sebastian castañeda on
Hello. I am a student who is interested in learning about the methodology of LEED certification and there are some points that I do not clear.
Inconsistent Price Square Meters versus Square Feet
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Ben Stanley on
We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu
Brazilian Equivalent Standard
CS-2009 EAp2:Minimum energy performanceposted by Pamela Svetllana Santos Souza on
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.