Forum quick links
Windows complying ASHRAE 90.1-2007
CS-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hello, We have a building which is going under major renovations, one of the most important is replacing old operable windows by new windows with new frames and glasses.
Calculator Password
CI-2009 WEp1:Water use reductionposted by Caroline Shannon de Cristo on
Is it possible to access the Indoor Water Use Reduction Calculator Excel file without a password? What password is this asking for?
LEED V4 - TENANT SPACE ENERGY MODELING
CI-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calgulator that should be used instead of Table 1.4, my questions are: 1.
Beach as a basic service
NC-2009 SSc2:Development density and community connectivityposted by Lucas Bizelli on
We have a project in Rio de Janeiro that is near to the beach (between 1/2 mile).
HC near Airport
Healthcare-v2009 IEQc2:Acoustic environmentposted by Saymon Grauppe on
Hello. I'm working on the design of a hospital and there is a doubt in the table 1.3-1 of the Sound & Vibration Guidelines FGI. The hospital is located 2600ft from the runway threshold .
Heating System G3.1.10 ( c )
CS-2009 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello, I’m working on a Core & Shell office building in Bogota and the baseline system is 8.
Hangar
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
My project is a 93,000 sf open-plan hangar. We are designing grills on walls that count for 4% of the floor area on 2 opposite facades to induce crossed-ventilation.
Electric Vehicles Fueling Stations / Parking Spots
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Daniel Brum on
Our project is an office building that is pursuing LEED for CS (2009).
Section 6.4.1.2, crossed ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
I don't know how to interpret the following section of ASHRAE 62.1-2010: "6.4.1.2. Double side openings.
Major renovations
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Veronica Reed on
Hello, what level of intervention would constitute as "Major Renovation"?