Lighting Power Densities for an auditorium
NC-2009 EAp2:Minimum energy performanceposted by Alan Viale on
Hi LEED experts! There is an auditorium in my project, also there will be a stage and a rehearsal.
calculator v06
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by M. Galvao on
Hi, I'm using for the first time the "water use reduction calculator v06" and I have a question about the table "flush fixtures". When I have a toilet male, a toilet female and a urinal, what is t
Baseline ventilation rates
NC-2009 EAp2:Minimum energy performanceposted by TOMAS URIBE on
When the project is pursuing the increase ventilation which ventilation rates have to be used for the baseline 62.1 or 62.1 + 30%? I am working in LEED V2009. ASHRAE 90.1-2007
IDF curves
NC-2009 SSc6.1:Stormwater design - quantity controlposted by MKK LEED on
Hi, I have a NC project in Colombia and the Environmental Authority just have IDF curves since 3 years. I don't have information since 1 and 2 years.
Additional lighting power density in a retail store
CS-2009 EAp2:Minimum energy performanceposted by Felipe Duran on
Dear All, We are working on a shopping mall project which is pursuing LEED for C&S certification.
New purchases Energy Star
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Cesar Ruiz on
In the EAp2 and EAc1.4 for LEED CI v2009, you established that projects may include only new equipment and appliances purchased for the LEED-CI scope of work in the list for Energy Star rated equip
Elegible On-Site Energy Systems
NC-2009 EAc2:On-site renewable energyposted by Paula Hernandez on
What is exactly a "Low-impact hydroelectric power systems" and how do we demonstrate that it is low-impact. I suppose that electricity coming from a conventional hydroelectric dam is not elebible f
Modeling of CHP
CS-2009 EAp2:Minimum energy performanceposted by MARCIO OROFINO on
I am working in a project that had a previous consultant and we do not agree with the way the CHP shall be modeled.
Energy Modeling In a High bay Industrial area + Office
NC-2009 EAp2:Minimum energy performanceposted by Marcelo Maciel de Santa Helena on
What’s the best way to proceed with the energy model of the following case? The building is a 4000m² manufacturing building where there is a small office area and a large high bay industrial area.
Sediment Basin dimensioning
NC-2009 SSp1:Construction activity pollution preventionposted by Paula Hernandez on
Hi, this may be a silly question. When dimensioning a temporary sediment basin, the CGP says to use either the calculations for the 24 hs- 2 year desing storm or 3600 cubic feet x acre drained.