NC-2009 SSp1:Construction activity pollution prevention
posted by  Paula Hernandez  on 

Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Apr 7, 2015, 10:29 pm

Actual Material Cost vs. Material Cost: what's the difference?

NC-2009 MRc4:Recycled content
posted by  Marcio Alberto Casado Pereira  on 

We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.

20
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Fri Apr 3, 2015, 1:30 am

cxa requirements

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  andres ramirez  on 

Hi I’m an arquitect and I just got the CPMP-commissioning certification from ASHRAE, I’ve been working already in 4 leed projects as a leed project manager.

3
Thu Mar 19, 2015, 10:16 pm

Services inside a mall would do?

NC-2009 SSc2:Development density and community connectivity
posted by  Marcio Alberto Casado Pereira  on 

We have a project built right next to a shopping center. The shoppping center has more than the 10 basic services inside. WoIuld those 10 sevices qualify?

3
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Mon Mar 2, 2015, 3:03 pm

Option 1: Zoning and controls

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Diego Pietzsch  on 

I've been working in a LEED CI: Retail for a small store in a mall. I'm wondering to persue the option 1: zoning and controls for the project but i'm not sure if the sales floor of the store shoul

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jan 27, 2015, 11:41 am

Perimeter Controls

NC-2009 SSp1:Construction activity pollution prevention
posted by  Gabriela Mesquita  on 

Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).

6
Wed Jan 14, 2015, 7:23 pm

PBE Edifica for EAp2 compliance

CS-2009 EAp2:Minimum energy performance
posted by  Mauricio Torres  on 

Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jan 13, 2015, 3:25 pm

Stadium seating - need SRI? Is it an appurtenance/usable space?

NC-2009 SSc7.2:Heat island effect - roof
posted by  Marcio Alberto Casado Pereira  on 

We just got a review from a stadium Project we are working on in Brazil and the review team asked us to double check the roof area considered, stating that part of our seating area covers enclosed

2
Tue Oct 28, 2014, 12:57 am

The missing point

NC-2009 IEQc7.2:Thermal comfort - verification
posted by  Cesar Ruiz  on 

Greetings, I am developing a exclusively residential project, and thus I realize that this credit is not applicable for my project.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Oct 22, 2014, 7:50 pm

Sediment Basin

NC-2009 SSp1:Construction activity pollution prevention
posted by  Paula Hernandez  on 

Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Oct 16, 2014, 3:17 pm