Energy Modeling In a High bay Industrial area + Office
NC-2009 EAp2:Minimum energy performanceposted by Marcelo Maciel de Santa Helena on
What’s the best way to proceed with the energy model of the following case? The building is a 4000m² manufacturing building where there is a small office area and a large high bay industrial area.
Sediment Basin dimensioning
NC-2009 SSp1:Construction activity pollution preventionposted by Paula Hernandez on
Hi, this may be a silly question. When dimensioning a temporary sediment basin, the CGP says to use either the calculations for the 24 hs- 2 year desing storm or 3600 cubic feet x acre drained.
Semi-permanent streams
NC-2009 SSp1:Construction activity pollution preventionposted by Paula Hernandez on
Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .
Actual Material Cost vs. Material Cost: what's the difference?
NC-2009 MRc4:Recycled contentposted by Marcio Alberto Casado Pereira on
We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.
cxa requirements
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by andres ramirez on
Hi I’m an arquitect and I just got the CPMP-commissioning certification from ASHRAE, I’ve been working already in 4 leed projects as a leed project manager.
Services inside a mall would do?
NC-2009 SSc2:Development density and community connectivityposted by Marcio Alberto Casado Pereira on
We have a project built right next to a shopping center. The shoppping center has more than the 10 basic services inside. WoIuld those 10 sevices qualify?
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Diego Pietzsch on
I've been working in a LEED CI: Retail for a small store in a mall. I'm wondering to persue the option 1: zoning and controls for the project but i'm not sure if the sales floor of the store shoul
Perimeter Controls
NC-2009 SSp1:Construction activity pollution preventionposted by Gabriela Mesquita on
Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).
PBE Edifica for EAp2 compliance
CS-2009 EAp2:Minimum energy performanceposted by Mauricio Torres on
Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.
Stadium seating - need SRI? Is it an appurtenance/usable space?
NC-2009 SSc7.2:Heat island effect - roofposted by Marcio Alberto Casado Pereira on
We just got a review from a stadium Project we are working on in Brazil and the review team asked us to double check the roof area considered, stating that part of our seating area covers enclosed