NC-2009 SSp1:Construction activity pollution preventionposted by Paula Hernandez on
Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .
Actual Material Cost vs. Material Cost: what's the difference?
NC-2009 MRc4:Recycled contentposted by Marcio Alberto Casado Pereira on
We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.
cxa requirements
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by andres ramirez on
Hi I’m an arquitect and I just got the CPMP-commissioning certification from ASHRAE, I’ve been working already in 4 leed projects as a leed project manager.
Services inside a mall would do?
NC-2009 SSc2:Development density and community connectivityposted by Marcio Alberto Casado Pereira on
We have a project built right next to a shopping center. The shoppping center has more than the 10 basic services inside. WoIuld those 10 sevices qualify?
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Diego Pietzsch on
I've been working in a LEED CI: Retail for a small store in a mall. I'm wondering to persue the option 1: zoning and controls for the project but i'm not sure if the sales floor of the store shoul
Perimeter Controls
NC-2009 SSp1:Construction activity pollution preventionposted by Gabriela Mesquita on
Good day I want to consult in relation to a project in a lot of 10 hectares (about 25 acres) with a perimeter of 1377 m (about 4500 ft).
PBE Edifica for EAp2 compliance
CS-2009 EAp2:Minimum energy performanceposted by Mauricio Torres on
Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.
Stadium seating - need SRI? Is it an appurtenance/usable space?
NC-2009 SSc7.2:Heat island effect - roofposted by Marcio Alberto Casado Pereira on
We just got a review from a stadium Project we are working on in Brazil and the review team asked us to double check the roof area considered, stating that part of our seating area covers enclosed
The missing point
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Cesar Ruiz on
Greetings, I am developing a exclusively residential project, and thus I realize that this credit is not applicable for my project.
Sediment Basin
NC-2009 SSp1:Construction activity pollution preventionposted by Paula Hernandez on
Hello again, we are working on a project for which we are installing a sediment basin. According to EPA we could use the calculation of 3600 ft3 / acre drained to size it.