Forum quick links
Manual controls - remote control device
NC-v4 EQc6:Interior lightingposted by A&L SUSTENTABILIDADE on
The EQ credit Interior Lighting – Option 1 - Lighting Control states that “switches or manual controls must be located in the same space as the controlled luminaires.
Integrated Pest Management
Pilot-Credits SSpc82:Local food productionposted by Adriana Hansen on
Hi everyone!
Sidewalks width
ND-Plan-v4 NPDp1:Walkable streetsposted by Gabriela Mesquita on
Hello, I have a query.
In the Walkable Streets Prerequisite, specifically at point C.
Performance Targets on Policies
EBOM-v4.1 MRp1:Purchasing Policyposted by Sofia Barahona on
We are currently working on the LEED O+M v4.1 certification of a project, and we have some doubts regarding some prerrequisites that requires the development of policies.
BD+C vs ID+C Rting System Selection
Retail-CI-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are working on a Retail (fast food store) that is currently in the LEED registration process.
BD+C vs ID+C Rating System Selection
Retail-CI-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are working on a Retail (fast food store) that is currently in the LEED registration process.
Roll out mats specifications?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Victoria Rios Esteve on
Hi everyone! On our project, we are placing rollout mats on the exterior but under roof hanging. Do you have any suggestion on brand/model/type we can get to achieve this credit?
Pilot-Credits WEpc94 - No Cooling Tower
Pilot-Credits WEpc94:No Cooling Towerposted by Adriana Hansen on
We would like to know if there is an estimated date of closure.
Bird collisions/Interference in the migratory route
Pilot-Credits SSpc55:Bird collision deterrenceposted by Ricardo Gomes on
I’m curious if there is a pattern flight height for migratory birds.
Natural ventilation room by room calculation
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Agustin Bertolotti on
Hi everyone