Forum quick links
Eficiency of Electric motors operated with VFD
CS-2009 EAp2:Minimum energy performanceposted by Pedro Urazan on
I would like to know if electric motors that are going to be operated by a VFD (Variable Frequency Drive), need to comply with the eficiency requirements of the ASHRAE 90.1 table 10.8. Thanks
multi occupant spaces for outpatient
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by andres ramirez on
HI, Multi occupant patients spaces (eg. waiting rooms for outpatients) should be listed on the shared multioccupant spaces IEQc6.1-3 or on patient areas Table IEQ6.1-2.? thanks
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
Aeronautical Maintenance Workshop
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Gustavo De las Heras Izquierdo on
This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features: -The space is 6 meters height. -There are interior walls 5 meter height.
2 Buildings in the same lot
CS-2009 MPR3:Must use a reasonable site boundaryposted by Guillermo Alonzo on
Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.
Energy Star Alternative
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Cesar Ruiz on
A refrigerator labeled 'California Energy Commission Certificated' is valid as an alternative for an Energy Star qualified equipment?
Diverse uses located within LEED project boundary
CS-v4 LTc6:Bicycle facilitiesposted by Ricardo Sá on
I'm working on a shopping center development that will include at time of occupancy more than 10 diverse uses within project boundary.
Emission Reporting (ISO 14064/ Portfolio Manager)
EBOM-2009 EAc6:Emissions reduction reportingposted by Esteban Martinez on
Hi, We are working in a project in Colombia.
Vegetation under solar panels
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Cesar Ruiz on
Hello, We are working on a project which is going to have almost all of its roof covered by solar panels.