Forum quick links
Pursuit of Procurement of Low Carbon Construction materials
Pilot-Credits MRpc132:Procurement of Low Carbon Construction Materialsposted by Patty Marr on
Our project in Kirkland, WA has pursued this credit.
Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Pursuit of Social Equity Within Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Marr on
Our team is pursuing this pilot credit.
Is a TVOC emissions evaluation for an epoxy flooring system's topcoat acceptable?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Lutfi-Hisham Muhammed on
We are managing the new construction of a pharmaceutical production facility where we have an epoxy flooring system to be installed which consists of a primer, application of the main product (prod
Whole Project Water Use Reduction
Pilot-Credits WEpc115:Whole Project Water Use Reductionposted by Mo Chesh on
This is the first time I have implemented this pilot credit/ACP.
Onsite Carbon Sequestration Through Plantings - Pilot credits - SSpc158
posted by Evan Constant on
Option 1 for the Onsite Carbon Sequestration Through Plantings pilot credit requires showing the amount of CO2 sequestered by all trees and shrubs on the proposed site is at a minimum a 10% in
If this Pilot Credit is pursued as an ID credit under initial ID+C certification, can Green Cleaning also be pursued?
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Susan Di Giulio on
If this Pilot Credit is pursued as an ID credit under initial LEED-ID+C v4 certification, can Green Cleaning (as part of the O+M Starter Kit) also be pursued?
Testing Protocol and Training Requirements
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Beth Brownlie on
Cleanliness Protocols: Wondering if there has been any pushback from Operators/Facility staff on these protocols and the training requirements?
Option 2. financial support
NC-v4 SSc2:Site development - protect or restore habitatposted by Theresa Lehman on
Has anyone achieved this credit for a government entity such as a municipality, where the government entity has provided a financial budget to restore greenway space, waterways, etc.