Site calculations for single building part of a larger complex
NC-v4 SSc2:Site development - protect or restore habitatposted by MICHAEL LOPEZ on
We have a five-acre site with multiple buildings. However, we are pursuing certification for only one of the buildings. Does the entire site have to meet the prerequisite?
EA-p2: EnergyStar TargetFinder Score
CI-v4 EAp2:Minimum energy performanceposted by Nikhilesh Srinivasan on
My project is an office tenant fitout (1 floor in a high-rise building).
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
CFD Model
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by ESD Engineer on
I'm currently working with a CFD modeler for the contaminants portion of this credit. We're having trouble finding the generation rates per square foot of active contaminant.
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Sculpture Lighting
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.
Hardscape covered by building.
NC-2009 SSc7.1:Heat island effect - nonroofposted by Robert Webber on
I'm working with a team on a hotel project, which is a highrise in a dense urban environment (100% of the site is covered by the building).
ITE for elementary school with half day students
Schools-2009 SSc4.4:Alternative transportation - parking capacityposted by April Brown on
In the ITE study calcs, does it make sense to only count the number of students in the building at one time.
Group Project - WEp1 & WEc3
Healthcare-v2009 WEp1:Water use reductionposted by Emily Hope on
In group projects, the WEp1 form requires data to be submitted separately for each project building.