Forum quick links
Process water and residential units
NC-v4 WEp2:Indoor water use reductionposted by MAUDE PINTAL on
Our project includes a community center and a multi-residential part.
Reduction of impervious area
NC-2009 SSc6.2:Stormwater design - quality controlposted by Danielle Spicer on
I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e
Requirement to survey students in higher ed bldgs?
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Renee Shirey on
In earlier versions of LEED 2009, the credit language specifically clarified that occupants included students grade 6 and above.
Evaporative water use
NC-v4 WEp2:Indoor water use reductionposted by MKK LEED on
The new prerequisite states "No once-through cooling with potable water for any equipment or appliances that reject heat". Does this exclude IDDE systems?
Protect Habitat on Campus
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Marissa Hebert on
Our project is a large medical campus with multiple buildings on a greenfield site.
CS v2009 Appendix 4 - Lease and Sales agreement
posted by Becky Stumm on
I have a project that the owner/landlord are seeking LEED-CS certification, but none of the tenants have any interest in seeking LEED-CI certification.
Denial of EA PR2
NC-2009 EAp2:Minimum energy performanceposted by Roxanne Button on
A client has asked for my advice in appealing the denial of PR2. I've taken a quick look at the review comments but will be digging deeper into it in the next couple of days.
Baseline Lighting Power for a Major Renovation
NC-2009 EAp2:Minimum energy performanceposted by Curtis Clark on
We are replacing the mechanical system, updating the plumbing system and insulating the building envelope for an existing office building.
EBOM 2009 IEQ3.2 Alternative Compliance Path
EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Kimberly Hosken on
Our project is a five story public building with operational contracts which include "contract document requirements".
Building Entrances
NC-v4 EQp2:Environmental tobacco smoke controlposted by Johanna Scogin on
We have some overhead rolling doors (for trucks to enter the garage portion of the commercial building) along with some man doors.