MRpc69 Attainable in Commercial Interior Project
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Erica Suarino on
This credit was easily attainable for an interior renovation in the New York metropolitan region.
Ergonomist Design Phase Involvement
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Marissa Hebert on
This may be an obvious answer, but it seems a little vague to me.
Phases of construction
Schools-2009 MPR2:Must be a complete, permanent building or spaceposted by Cindy Quinn on
I have a situation where an owner is planning phased construction. It is possible, but not definite that both phases will be complete at the time of LEED certification.
Option 1 - What to include in Site Area calc
CS-2009 SSc2:Development density and community connectivityposted by Jay Murray on
I have 15 properties that fall within my Density Radius. I did not include the public roads in this square footage calculation, nor did I include a public parking lot that fell within my radius.
Translucent Glazing Film
NC-v4 EQc2:Low-emitting materialsposted by Eric White on
Our project is using a translucent film on several demountable glass office partitions to provide screening and privacy.
NC v2.2 Optional Misc. Documents on Project Summary DocumentsTab
posted by Heidi Sentivan on
Hello, We are getting ready to submit our combined NCv2.2 submission.
Laboratories - Appendix G Baseline System
NC-2009 EAp2:Minimum energy performanceposted by Adam Judge on
G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur
Campus-Wide Recycling Program
NC-2009 MRp1:Storage and collection of recyclablesposted by Daniel Montgomery on
I'm working on a new classroom building on a university campus. The university's cleaning service picks up trash and recycling daily from all of the classrooms, hallway receptacles, etc.
Cleaning Requirements for bathroom demo
CI-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Megan Bove on
If there is a CI project that has an existing bathroom that is set to be demolished as other build outs are happening, are there specific VOC requirements for the products that they can use?
Resinous Flooring
CI-v4 EQc2:Low-emitting materialsposted by Marcia Weekes on
Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?