Base building HVAC Efficiency and Baseline & Proposed WWR

CI-v4 EAp2:Minimum energy performance
posted by  ESD Engineer  on 

Hi, The projects space is served by the base building AHU and Chiller plants. Efficiency of which don't meet the min prescribed efficiency as per ASHRAE 90.1-2010.

1
Wed Aug 23, 2017, 1:58 pm

Changing Innovative Design Credits during Review Process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ralph Bicknese  on 

We are in the process of submitting a project for LEED construction credit documentation.

1
Thu Dec 4, 2014, 10:37 pm

v2009 Project to comply using Building Automation System?

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Sara Greenwood  on 

Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m

1
Wed Jan 18, 2017, 1:14 am

Master's Research Survey

Pilot-Credits MRpc76:Material ingredient reporting
posted by  Vibha Pai  on 

I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.

0

Exemplary Performance - Unobstructed View

NC-2009 IEQc8.2:Daylight and views - views
posted by  Erin Holdenried  on 

I am having a hard time understanding the criteria for "unobstructed view". Does it have to do with interior space layout and the depth of the space in relation to the exterior window? Thanks

0

Additions While Project is in Certification Review Process

Schools-2009 PIf2:Project Summary Details
posted by  Robert Fiala  on 

We have a large school project (340,000 sf) that has been submitted for the design phase review and all design phase points are reviewed and marked as anticipated.

1
Tue Nov 24, 2015, 8:03 pm

simple box model

NC-v4 IPc1:Integrative process
posted by  Courtney Royal  on 

how do you define a simple box model? for example, do you need to model thermal zones, etc.

1
Wed Apr 26, 2017, 2:01 pm

ETS During Construction

NC-v4 EQp2:Environmental tobacco smoke control
posted by  L W  on 

Does the ETSC prerequisite apply during construction as well?

1
Thu May 7, 2015, 10:09 pm

Fraction use of FSC materials

NC-2009 MRc7:Certified wood
posted by  Lilian Seow  on 

This question and answer come from above and Missing Manual: A product has FSC-certified veneer, but a non-certified core. Can we prorate the MRc7 contribution of this product based on the cost of