Building Envelope Trade Off
NC-2009 EAp2:Minimum energy performanceposted by James Lee on
I have 2 questions about EAp2. 1.
School outisde of project boundary
ND-Plan-v4 NPDc15:Neighborhood schoolsposted by Sarah Kearney on
The requirements do not specify if the school has to be within the project boundary.
Energy and Atmosphere credit #5
NC-2009 EAc5:Measurement and verificationposted by James Goldfield on
I had a question in regards to the energy and atmosphere credit #5 which states a need for a measurement and verification plan.
Need for consistent numbering system across all rating systems
posted by Lyle Axelarris on
I definitely like having credit numbers as they save a lot of time in communication and reference.
Deck over parking; do I have this right?
NC-2009 SSc7.1:Heat island effect - nonroofposted by Susan Di Giulio on
Our project has multiple levels of parking under a large podium plaza. I believe this is what what the Reference Guide (p 112) refers to as a "deck", right?
Changing Innovative Design Credits during Review Process
posted by Ralph Bicknese on
We are in the process of submitting a project for LEED construction credit documentation.
v2009 Project to comply using Building Automation System?
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Sara Greenwood on
Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m
Master's Research Survey
Pilot-Credits MRpc76:Material ingredient reportingposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
Exemplary Performance - Unobstructed View
NC-2009 IEQc8.2:Daylight and views - viewsposted by Erin Holdenried on
I am having a hard time understanding the criteria for "unobstructed view". Does it have to do with interior space layout and the depth of the space in relation to the exterior window? Thanks
Additions While Project is in Certification Review Process
Schools-2009 PIf2:Project Summary Detailsposted by Robert Fiala on
We have a large school project (340,000 sf) that has been submitted for the design phase review and all design phase points are reviewed and marked as anticipated.