Diverse "publicly available" use

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Gina Rossi  on 

Working on a NC project on a private college campus and wondering how rigid USGBC is in defining "publicly available".

1
Mon Jan 23, 2017, 4:28 pm

Pot washing sink

NC-2009 WEp1:Water use reduction
posted by  Christine Harvey  on 

I saw a comment on this site that implied the water used for pot washing sinks and kitchen food prep sinks can be excluded from the calculations, can someone verify that for me?

1
Mon Oct 20, 2014, 3:23 pm

FTE of hotel guests

NC-2009 PIf3:Occupant and Usage Data
posted by  Rob Hink  on 

How do I calculate FTE of hotel guests? I know have to do it during non-peak time of year and peak time of year. Also what do I do for visitors and transients?

1
Wed Mar 9, 2016, 9:15 pm

Enclosure Cx Provider

NC-v4 EAc1:Enhanced commissioning
posted by  Brett Farbstein  on 

The project is pursuing v4. A 3rd party Cx provider has been engaged for MEPs.

1
Fri May 12, 2017, 4:45 pm

Energy Model for Healthcare/Assisted Living

Healthcare-v2009 EAp2:Minimum energy performance
posted by  Carrie Webster  on 

Hi, my project is registered under LEED NC but it's a healthcare related question. I did pose the question there but no one could help.

1
Sun Aug 27, 2017, 12:56 am

Do individual storage facilities count as long-term storage?

Mid-Rise-v4 LTc2:Site selection
posted by  Tim Nabholz  on 

I have a project that has 69 dwelling units and provides indoor bicycle storage for 39 bikes. The project also includes storage lockers in the underground garage for each unit.

1
Tue Jan 22, 2019, 6:28 pm

Wedding Hall with Dance space Design for Credit 7.1 & 7.2

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Lew Bonadies  on 

We wish to pursue the credits IEQ 7.1 & 7.2 , the space is auditorium seating with a dance floor for Wedding .(Area - 5300 sq ft , Occupancy 370 People), having office spaces on other floors .

0

Site Boundary Including Other Structures

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Vicki Rybl  on 

We are certifying a ~30K sf building that shares its site (legal parcel) with a large 8 story garage.

1
Tue Jan 17, 2017, 9:43 pm

Combined approach

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Claire DeCamp  on 

We have a project that is going to use a combined approach due to overhangs and the prescriptive calcs not providing enough SF. I have casually measured the spaces and we exceed 20fc.

1
Fri Dec 11, 2015, 12:56 pm

Construction waste diversion from the site

CI-v4 MRc6:Construction and demolition waste management
posted by  Tracy Backus  on 

How would packaging, for furniture, be included in this conversation?

1