Forum quick links
Detention Center Perimeter and Recreation Yard Security Lighting
NC-2009 SSc8:Light pollution reductionposted by Dranan Sparks on
I have a state owned youth detention center (jail) project in lighting zone LZ1.
Master site credits
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by charles bell on
We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?
EBOM-2009 RPc1:Regional priorityposted by Michelle Bracewell-Musson on
Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.
TPO Roofing
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Celimar Fournier on
Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?
Use of Microfiber
EBOM-v4 EQp3:Green cleaning policyposted by Louise Taillon on
I am confused on the use of microfiber in a green cleaning policy and program. Is the use of microfibers required as part of a high Performance cleaning program?
Space Type
Schools-2009 IEQc6.1:Controllability of systems - lightingposted by Saif Abdulameer on
Hello, I am working on school that has a study area, a lounge and common area as a part of a vestibule that leads to the outside or a corridor that connects classrooms.
Cold C&S - No HVAC
CS-2009 EAc1:Optimize energy performanceposted by Scott Johnson on
We have a project that consists of a cold core and shell that will have warm lobby.
2009 calculator - "private" bathrooms in a commecial facility
EBOM-2009 WEp1:Minimum indoor plumbing fixture and fitting efficiencyposted by Jessica Hawley on
I have mulit-story office building where the first floor has only one "private" bathroom for guests of the building to use in the lobby.
Alternative Path for the Optimize Energry Performance
EBOM-v4 EAp2:Minimum energy performanceposted by Meier Corporate Account on
We are a brand new dairy located in Ohio. We were constructed in 2014 and went online in 2015. In 2014 there were only 3 new dairies built.