Forum quick links
Wedding Hall with Dance space Design for Credit 7.1 & 7.2
NC-2009 IEQc7.1:Thermal comfort - designposted by Lew Bonadies on
We wish to pursue the credits IEQ 7.1 & 7.2 , the space is auditorium seating with a dance floor for Wedding .(Area - 5300 sq ft , Occupancy 370 People), having office spaces on other floors .
Site Boundary Including Other Structures
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Vicki Rybl on
We are certifying a ~30K sf building that shares its site (legal parcel) with a large 8 story garage.
Combined approach
NC-2009 IEQc8.1:Daylight and views - daylightposted by Claire DeCamp on
We have a project that is going to use a combined approach due to overhangs and the prescriptive calcs not providing enough SF. I have casually measured the spaces and we exceed 20fc.
Construction waste diversion from the site
CI-v4 MRc6:Construction and demolition waste managementposted by Tracy Backus on
How would packaging, for furniture, be included in this conversation?
Pursing credit in an existing building
Pilot-Credits EQpc78:Design for active occupantsposted by Dee Spiro on
Our project involves renovating an existing building on a university campus.
Campus Projects, overlapping boundaries
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michele Helou on
MPR Supplemental Guidance page 16 states that projects in phases may have an overlapping boundary. Let's say phase 1 included shared drive and parking and it does NOT earn SSc7.1 or SSc8.
What does LEED consider as Sitework?
NC-2009 SSp1:Construction activity pollution preventionposted by Erika Duran on
Project sitework and stabalization techniques were implemented during the beginning stages of the project and followed our ESC plan as well as local jurisdiction requirements.
renovation and addition: effect on site boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ramana Koti on
Dear all, We're working on a project that renovates a tiny portion (interior fit out only) of an existing building and involves an addition right next to the renovated portion.
Cx - Warranty Review After Building is Sold
NC-2009 EAc3:Enhanced commissioningposted by Andy Smith on
We completed fundamental and enhanced Cx for a building in August of 2016 (with the exception of 10 month warranty review).
Integrative Pilot Credit - Design or Construction Credit
Pilot-Credits PC60:Integrative Processposted by Devki Wright on
Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?