SS 7.2 (v2009 C+S) -- Tenant Improvements to Roof
CS-2009 SSc7.2:Heat island effect - roofposted by Justin Oldfield on
Our core and shell project has chosen a roofing material compliant with SS 7.2.
Updating documentation with consistent or more recent dates?
posted by Sara Goenner Curlee on
For various reasons, my project's Design Submittal got put on hold in 2014 after most of the work effort was done and uploaded to LEED Online.
Enhanced IAQ Strategies - Hazardous Gases/Chemicals
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Mark Zoeteman on
Option 1, Enhanced IAQ Strategies, paragraph B states spaces are to be exhausted where hazardous gases or chemicals may be present or used.
FTE, visitor count and space usage in shell space
NC-2009 PIf3:Occupant and Usage Dataposted by JASON BONE on
We are working on a major renovation healthcare project for a four story building which is fully owned by the owner.
Level of detail (cfm) with Trane Trace for LEED -S & L buildings
NC-2009 EAp2:Minimum energy performanceposted by Maria Spastri on
Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?
C2C Bronze in LEED v3?
CI-2009 IDc1:Innovation in designposted by Brian Salazar on
Hi all - I am aware of the calculations for C2C products for ID credits in LEED v3 (Silver, Gold, Platinum).
Joint Compound
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?
Using pre-existing conditions as oppposed to existing conditions
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Mei Zhu on
SS C6.1 has two cases: Case 1: Sites with existing imperviousness 50% or less: Requires proposed runoff not exceeding the existing runoff. Case 2: Sites with existing imperviousness greater than 50
Trace 700 Performance Summary Report
NC-2009 EAp2:Minimum energy performanceposted by Aru Sau on
Is the Performance Summary Report generated by Trane Trace 700 (Ver 3.0) be enough for the LEED V4 EA credit?
Emergency Lighting within Daylight Zone
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by William Weaver on
I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.