Forum quick links
video conferencing equipment
CI-2009 EAp2:Minimum energy performanceposted by Kristen Magnuson on
Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.
Over limit adhesive used while building is open
CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Jayme Antolik on
I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?
Bicycle Shower Facilities
NC-v4 LTc6:Bicycle facilitiesposted by S. Sachs on
Follow up question to Miles's question about the shower facilities in an adjacent building: I have a similar building that is being built part of a school campus, in which the building adjacent t
Seeking more clarity on active vs, passive storage
NC-2009 PIf3:Occupant and Usage Dataposted by Susan Di Giulio on
We have a campus housing maintenance building with two large storage rooms: they will contain replacement pieces (furniture, carpet etc.) and housekeeping materials for the dormitories.
Exterior Metal Halides
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by Dianne Herrin on
We are working on a V4 BD+C Healthcare Project, and we're completing the Source Reduction Calculator for the M&R Credit PBT Source Reduction-Mercury.
Total Site Areas
CS-2009 SSc5.2:Site development - maximize open spaceposted by Dave L on
Hi, I am working with a project that is beneath a municipal park.
No floor
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by April Ambrose on
A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.
Registering an individual project under a Campus project
posted by Sean Quinn on
Does anyone know if we can register an individual project under a master site with only the master site name and ID information and without actually having access to the master site project on LEED
Amphitheater Occupancy for SS and WE
posted by Peter Doo on
Amphitheater Occupancy Project Location: United States Our project is the back stage area of a seasonal outdoor amphitheater concert venue.