Forum quick links
Mechanical Boundary Differs from Overall Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by John Havenstrite on
I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
Environmental Product Declaration cost markup
posted by Helene Lefkowitz on
I am working on a v4 project and am trying to compare the price of materials with environmental product declarations (EPDs) vs. materials without EPDs.
Determining Site Boundary on Renovations/Additions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Buck on
We are working on a Hotel that is both a renovation and major new construction.
School Facilities
CI-2009 SSc2:Development density and community connectivityposted by Neil Rosen on
Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?
Concrete Regional and Recyle Content
NC-2009 MRc5:Regional materialsposted by Rick Alfandre on
I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th
LEED ND v3 Examination End Date
posted by Michael McElroy on
According to an update posted May 15 to http://www.usgbc.org/articles/leed-v4-credential-exams-coming-june-2014 "Exams for the LEED Green Associate, BD+C, ID+C and O+M will feature v4 content in J
LEEDv4 Homes - Parking Structure
Homes-v4 MPR2:Must use reasonable LEED boundariesposted by Sara Greenwood on
It does not appear that parking structures are required to be included in the LEED-H boundary, however if the structure is being built to service a student housing building and energy modeling incl
WEp1 - PIf3 link - new LEED on line
NC-2009 WEp1:Water use reductionposted by Todd Bundren on
My project was upgraded to the new version of LEED online around the beginning of the year so I am getting used to the new set up (so far it is very nice).
Steel Studs vs. Track
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Johanna Scogin on
Does the steel stud count as different material than the track?