MPR3 - Hotel in Mixed Use Building
CI-2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants.
short term bicycle storage
NC-v4 LTc6:Bicycle facilitiesposted by sue bryant on
Can this be located inside a building as long as it is within 100' of the main entrance?
mirror mastics that contain carcinogenic ingredient
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Debra a. Lombard on
The two mirror mastics that I found both contain carcinogenic ingredients, however they both meet the VOC limit of 250 g/L.
Option 2 for a Partially Enclosed Building (LEED NCv2.2)
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by SIG - Sustainability Main Account on
We performed IAQ testing to meet IEQc3.2 on a subway station. The IAQ levels passed easily, and our approach was recognized by the LEED reviewer as an appropriate approach.
Equipment and Applicances
CI-v4 EAc2:Optimize energy performanceposted by Casey Krieg on
This question is in regards to the Optimize Energy Performance section, under the Prescriptive compliance method and more specifically the Equipment and Appliances credits. My team and I are seeki
DES Option 1 - Baseline System Heating Type Clarification
NC-2009 EAp2:Minimum energy performanceposted by Mike Ramos on
We're using Option 1 of the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Construction" document to comply with EAp2 / EAc1.
How to define affordable housing : rental and for-sale
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?
Roof Area Clarification
CS-2009 SSc7.2:Heat island effect - roofposted by Maggie Hogan Skaug on
Looking for a clarification on the "Roof Area" definition, in particular, what constitutes an "open covered parking structure".
New O & M Starter Kit IN Credits
NC-2009 IDc1:Innovation in designposted by Kristen Callori on
Hello- Now that these new O & M Starter Kit IN credits are available, and they require that (2) O&M Prerequisite Plans be implemented (such as Green Cleaning + Integrated Pest Management) i
"Conditioned Space?" - Free cooling with outside air
NC-2009 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I am not sure whether to class mechanical rooms which are free cooled by outside air as "conditioned" for the purpose of the baseline (so the baseline would be on system 5 in this example).