Water Quality
CS-2009 SSc6.2:Stormwater design - quality controlposted by Nathan Anderson on
Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.
Compliance for Corporate Interiors?
Pilot-Credits EQpc78:Design for active occupantsposted by Rachel Bannon-Godfrey on
Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.
Fueling Capacity - multiple stations
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Garrett Ferguson on
In regards to the number of fueling stations, we have a charger that can charge 2 cars simultaneously (one plug on either side), and can reach 2 spots in either direction with a long cord.
IEQ4.1 Aerosol Adhesives conversion
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Kevin Taterus on
Using IEQc4.1 template version 4.0, in the notes under table IEQc4.1-1, the note #1 states "in the case of aerosol adhesives, the project team must provide a conversion of both the product VOC cont
green cleaning
CS-2009 IDc1:Innovation in designposted by Alfonzo Collins on
Realizing I should have posted this here...I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease,
Precertification - LEED 2009 Core & Shell
CS-2009 SSp1:Construction activity pollution preventionposted by Michael Heacock on
We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts
Default Space Susage Types - are there definitions?
CI-2009 PIf3:Occupant and Usage Dataposted by Stacey Olson on
I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?
EPD Option 2 - Compliance
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Alexa Stone on
For Option 2 - How do you determine credit compliance with an industry-wide EPD?
Maximum frontage without windows on primary facade
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
The project I'm testing this pilot credit with meets all but requirement 8, so the pilot credit has been "met".