Water Quality

CS-2009 SSc6.2:Stormwater design - quality control
posted by  Nathan Anderson  on 

Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.

1
Fri Feb 12, 2016, 5:05 pm

Compliance for Corporate Interiors?

Pilot-Credits EQpc78:Design for active occupants
posted by  Rachel Bannon-Godfrey  on 

Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.

1
Thu Jun 9, 2016, 3:09 pm

Fueling Capacity - multiple stations

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Garrett Ferguson  on 

In regards to the number of fueling stations, we have a charger that can charge 2 cars simultaneously (one plug on either side), and can reach 2 spots in either direction with a long cord.

1
Wed Apr 22, 2015, 3:31 pm

IEQ4.1 Aerosol Adhesives conversion

Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Kevin Taterus  on 

Using IEQc4.1 template version 4.0, in the notes under table IEQc4.1-1, the note #1 states "in the case of aerosol adhesives, the project team must provide a conversion of both the product VOC cont

1
Wed Oct 12, 2016, 3:11 pm

green cleaning

CS-2009 IDc1:Innovation in design
posted by  Alfonzo Collins  on 

Realizing I should have posted this here...I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease,

1
Sat Aug 26, 2017, 10:54 pm

Precertification - LEED 2009 Core & Shell

CS-2009 SSp1:Construction activity pollution prevention
posted by  Michael Heacock  on 

We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.

0

Envelop Commissioning

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Peter Doo  on 

The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts

1
Thu Mar 3, 2016, 9:36 am

Default Space Susage Types - are there definitions?

CI-2009 PIf3:Occupant and Usage Data
posted by  Stacey Olson  on 

I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?

1
Sat Aug 26, 2017, 11:55 pm

EPD Option 2 - Compliance

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Alexa Stone  on 

For Option 2 - How do you determine credit compliance with an industry-wide EPD?

1
Tue Jan 31, 2017, 3:13 pm

Maximum frontage without windows on primary facade

Pilot-Credits PC14:Walkable Streets
posted by  Margaret Montgomery  on 

The project I'm testing this pilot credit with meets all but requirement 8, so the pilot credit has been "met".

1
Fri Nov 4, 2016, 8:25 pm