Forum quick links
Existing Insulated Glass Units
CS-2009 EAp2:Minimum energy performanceposted by Donald Green on
We have an existing building whereby some of the existing glass will remain however we cannot determine what the thermal properties of the glass is because there is no documentation and the manufac
Airflow measurement device serving multiple AHUs?
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Mike Fortier on
Hello, Is it okay to install one airflow measurment device within an outdoor air intake that serves multiple AHUs or does each AHU need to have its own airflow measurement device? Thanks!
Interstitial or Interior Blinds
NC-2009 EAc1:Optimize energy performanceposted by Sandra Lester on
Would interstitial or interior blinds could contribute to load reductions and contribute to an increase in energy efficiency?
Table Plf3-2. vs. Table Plf3-3
NC-2009 PIf3:Occupant and Usage Dataposted by Michael Kennedy on
We have renovation of a college building. Most of the building is made up of faculty offices with some waiting areas and conference rooms.
shuttle bus to rail station
CI-2009 SSc3.1:Alternative transportation - public transportation accessposted by Gail Napell on
we have a project with the main entrance 0.3 miles from 4 public shuttle bus stops that provide express connections to a commuter (and regional, and national!) railway station.
Energy performance vs. Energy Cost
Mid-Rise-v4 EAc1:Annual energy useposted by Eesmyal Santos-Brault on
Hi - It seems that this version of the rating system is targeting energy performance improvement over energy cost budget. Is that right?
Fluch Out Complete - Fire Happened Near Building
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Sara Zoumbaris on
We have a facility that has been complete and turned over to the owner for a few months but has not yet been occupied; the building is waiting for all furniture to be delivered and put into place.
CO Sensors in Multi-Family Highrise
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jennifer Rennick on
For a Multi-Fam Highrise, the corridors will be heated with a ducted roof-top gas furnace split dx system will be installed.
Submitting design prereq. credits during construction review
posted by kelly ryan on
Is it acceptable to submit design prerequisite credits during the construction review phase?
Core and Shell v3 w/ ASHRAE 90.1-2010 w/o tenant agreement
CS-2009 EAp2:Minimum energy performanceposted by Curtis Clark on
We are working on a very large, core and shell project that the owner will not share the tenant agreement with our team. The minimum code requirements are based on IECC 2012/ASHRAE 90.1-2010.