Forum quick links
Mechanical Insulation
CS-2009 MRc4:Recycled contentposted by Sarah Gagnon on
I know MEP components are not included in the MR4 credit. What about piping or duct insulation? Insulation is part of Division 7, so I say it should be included.
LEED for Homes MidRise and Commercial Condo Space
posted by Jennifer Preston on
First, context: We have been hired to certify a community space in the bottom 2 floors+basement of a 5-6 story Multi-Family MIDRise project.
PTAC Monitoring
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Dutchie Grossweiner on
In a mixed use building, the residential dwelling units are being provided outdoor air via PTAC systems (apartment size determines the number of PTAC units).
Updated/clarified primer voc limit
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Martha Norbeck on
Can you please update the FAQ section of LEED-NC v2009, IEQc4.2. The information on primers is out of date per interpretation/addenda #100001805.
How many points? Exemplary performance?
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Tiffany Moore on
This may be the most straight-forward question I've ever posted, but I'm frustrated. How many points are possible in IEQc4?
Sherwin Williams Pro-Cryl Universal Primer
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Celimar Fournier on
Under what category should I assign the Sherwin Williams Pro Industrial Pro-Cryl Universal Primer? This is an acrylic primer.
Power Line Overhead?
NC-2009 SSc5.2:Site development - maximize open spaceposted by Cindy Quinn on
Our LEED boundary has a power line easement running through it. The city's zoning doesn't allow development in this area.
Regulated vs. Unregulated??
NC-v4 EAc2:Optimize energy performanceposted by Edgar Arevalo on
I'm filling out the information from the energy model to the LEED v4 Minimum Performance Calculator and i noticed a check mark next to each end-use when filling out energy consumption and power dem
Water Usage for parks and open spaces
CS-2009 WEp1:Water use reductionposted by Deborah Lucking on
Our project is a small pavilion in a park, with tenant space for a food outlet, and (separate) restroom facilities to serve park users.
Final Cleaning
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Benjamin McGrath on
For the final cleaning bid package, in our specifications, there is no language requiring that the chemicals used have to be low VOC.