Attempting to return ceiling tiles from demo
CI-2009 MRc2:Construction waste managementposted by Dean Wilson on
We are performing a 2009 Commercial Interior for the reuse of a 7000 sq ft decommissioned Army base building. In the demolition phase, we collected old ceiling tiles to return to the manufacturer.
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Avery Colter on
OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook.
Major renovation of historic district bldg in historic district
posted by Pamela Smith on
Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.
LEED CI Regional Priority Documentation
CI-2009 RPc1:Regional priorityposted by Bethany Beers on
It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
SSc4.1 Bus Rapid Station
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Christopher Widdowson on
Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
93727 On-site & Off-site Ren. En. - RP for 6 Points if only Off?
EBOM-2009 RPc1:Regional priorityposted by Michelle Bracewell-Musson on
Hello, I know that a project can only earn Exemplary if 100% is off-set, however, it must be a COMBINATION of On-site and Off-site to earn EP.
TPO Roofing
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Celimar Fournier on
Are roofing materials part of this credit? Do I need to take into consideration the VOC Content of the TPO Bonding Ahesive, TPO Cut Edge Sealant, TPO Primer and the TPO Seam Cleaner?