Existing Building Envelope does NOT Meet ASHRAE 90.1-2007

CI-2009 EAp2:Minimum energy performance
posted by  James Keohane  on 

How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures?

1
Tue Jan 26, 2016, 11:02 pm

Bird Collision Deterrence Monitoring Plan

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Ivan Romero  on 

Our intention is to pursue Bird Collision Deterrence under NC. Several questions: 1.

0

Retro-Enhanced Commissioning

NC-2009 EAc3:Enhanced commissioning
posted by  Christian Pegher  on 

Our project is on hold until the fall. The construction documents are done, and the owner just hired a CxA. They'd like to have the CxA go back through the documents now and provide feedback.

1
Sat Aug 5, 2017, 5:08 pm

FTE Consistency Pertaining to IEQp1

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  Spencer Eldredge  on 

The need to keep FTEs consistent through all credits is stressed though in the case of IEQp1 where for Mechanical Ventilation, table IEQp1-3, for code compliance based on square footage, the Pz (zo

1
Mon Sep 29, 2014, 8:17 pm

2-seat Reception Area in Middle School

Schools-2009 IEQc6.1:Controllability of systems - lighting
posted by  Sara Zoumbaris  on 

Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.

1
Fri Dec 5, 2014, 4:01 pm

Heat Island Reduction when adjacent to existing building on lot

CS-v4 SSc5:Heat island reduction
posted by  Nadia Bini  on 

Hello, our project is connected to an existing building on the same lot. Can we exclude the existing building's roof surface from our credit calculations?

1
Tue Jul 11, 2017, 4:22 pm

Plant Design for Proposed bldg

NC-2009 EAp2:Minimum energy performance
posted by  Julian Park  on 

If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even

1
Thu Mar 5, 2015, 5:35 pm

Paint Certification

NC-v4 EQc2:Low-emitting materials
posted by  Rai Galang  on 

Just want to check if Green guard certification for the paint is approved for the LEED when applying for the Credit instead of Green Seal (GS-11) certification?

1
Thu Jun 23, 2016, 1:56 am

Ceiling Step Down

NC-v4 EQc8:Quality views
posted by  Kim Lombard  on 

Does anyone have a good sense of how to treat step down ceiling heights in calculating the interior distance qualifying for quality views?

1
Mon Aug 28, 2017, 11:25 am