Existing Building Envelope does NOT Meet ASHRAE 90.1-2007
CI-2009 EAp2:Minimum energy performanceposted by James Keohane on
How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures?
Bird Collision Deterrence Monitoring Plan
Pilot-Credits SSpc55:Bird collision deterrenceposted by Ivan Romero on
Our intention is to pursue Bird Collision Deterrence under NC. Several questions: 1.
Retro-Enhanced Commissioning
NC-2009 EAc3:Enhanced commissioningposted by Christian Pegher on
Our project is on hold until the fall. The construction documents are done, and the owner just hired a CxA. They'd like to have the CxA go back through the documents now and provide feedback.
FTE Consistency Pertaining to IEQp1
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Spencer Eldredge on
The need to keep FTEs consistent through all credits is stressed though in the case of IEQp1 where for Mechanical Ventilation, table IEQp1-3, for code compliance based on square footage, the Pz (zo
2-seat Reception Area in Middle School
Schools-2009 IEQc6.1:Controllability of systems - lightingposted by Sara Zoumbaris on
Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.
n/a
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Donna Juselis on
deleted
Heat Island Reduction when adjacent to existing building on lot
CS-v4 SSc5:Heat island reductionposted by Nadia Bini on
Hello, our project is connected to an existing building on the same lot. Can we exclude the existing building's roof surface from our credit calculations?
Plant Design for Proposed bldg
NC-2009 EAp2:Minimum energy performanceposted by Julian Park on
If a new building will be served by an existing chiller plant that already serves an existing building, does the Plant design for the Proposed Alternative need to model the full chiller size, even
Paint Certification
NC-v4 EQc2:Low-emitting materialsposted by Rai Galang on
Just want to check if Green guard certification for the paint is approved for the LEED when applying for the Credit instead of Green Seal (GS-11) certification?
Ceiling Step Down
NC-v4 EQc8:Quality viewsposted by Kim Lombard on
Does anyone have a good sense of how to treat step down ceiling heights in calculating the interior distance qualifying for quality views?