Forum quick links
The three dimensional orientation of the luminaire
Pilot-Credits SSpc7:Light pollution reductionposted by Aly Rawji on
Can you please provide a sample for this, what is required for "The three dimensional orientation of the luminaire (plan/ elevation)"?
Is there a limit to how many products can use the same CSR?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Alexa Stone on
An industry-wide (generic) EPD can be used for up to 10 products listed within the industry-wide EPD, provided that each application has separately reported impacts within the EPD.
Summary marked "N"
NC-2009 PIf3:Occupant and Usage Dataposted by Ryan Kurlbaum on
We have completed this form and for some reason continue to have the "summary" box marked as "N".
Separation between patient and staff places of respite
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Emily Hope on
I am seeking clarification on where places of respite for staff and for patients should be located.
Substantial Renovation - Envelope Modeling
Schools-NC-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Hi, I am modeling an existing school building which is undergoing substantial renovation. As a part of the renovations, new windows are being added and the grade level is being changed.
No Mow Grass
Schools-2009 SSc5.1:Site development - protect or restore habitatposted by Cynthia Kaplan on
My Massachusetts school project is restoring a large area and considering No Mow grass. Will this be considered as a monoculture like turf grass, or a meadow?
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Credit Interpretation Request to support SS p1.
NC-2009 SSp1:Construction activity pollution preventionposted by Marie-France Duthilleul on
When comparing your proposed ESC PLan Is there standard text language / narrative that clearly describs the requirements of Phase 1 and Phase II of the NPDES program.
Common Area Spaces/Tenant Fit Out
CS-2009 EAc1:Optimize energy performanceposted by Heather South on
I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space
Commingled waste
NC-2009 MRc2:Construction waste managementposted by Sundararaj Subburaman on
I have NC Retail 2007 project. The same type of waste is grouped together. For example, the metal includes iron, aluminium and etc, But sorting is done off site.