Forum quick links
Points awarded for reduced conditioned space
NC-v4 EAc2:Optimize energy performanceposted by Amrit Kaur on
LEED V4 homes awards ( and generously) for residential projects with areas smaller than an accepted reference standard, and deducts points for residential units exceeding these standards.
Confidential Projects Information Control
posted by Sara Goenner Curlee on
I am working on a v2009 NC project with a client very sensitive to the confidential nature of their work. The project is indicated as private/confidential through LEED Online.
Existing Central Plant serving new building
NC-2009 EAp2:Minimum energy performanceposted by Mital Patel on
Hello, We have an existing central plant that will be serving new building. How do we model this? Existing central plant will service one existing building and new building.
Mechanical Boundary Differs from Overall Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by John Havenstrite on
I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
Environmental Product Declaration cost markup
posted by Helene Lefkowitz on
I am working on a v4 project and am trying to compare the price of materials with environmental product declarations (EPDs) vs. materials without EPDs.
Determining Site Boundary on Renovations/Additions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Buck on
We are working on a Hotel that is both a renovation and major new construction.
School Facilities
CI-2009 SSc2:Development density and community connectivityposted by Neil Rosen on
Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?
Concrete Regional and Recyle Content
NC-2009 MRc5:Regional materialsposted by Rick Alfandre on
I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th
LEED ND v3 Examination End Date
posted by Michael McElroy on
According to an update posted May 15 to http://www.usgbc.org/articles/leed-v4-credential-exams-coming-june-2014 "Exams for the LEED Green Associate, BD+C, ID+C and O+M will feature v4 content in J