Forum quick links
Dorm Room Controls, no mechanical cooling
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Michele Helou on
We have a dormitory project with about 80% individual rooms and 20% double rooms. Each room is provided with a Thermostat and an operable window with over 4% operable window to floor area ratio.
Rainwater Management
Data-Centers-NC-v4 SSc4:Rainwater managementposted by Hadar Farjo on
Our Project is part of a Campus. Can we use the campus(regional) pond located outside our project boundary to achieve the rainwater management points for our project?
Water Quality
CS-2009 SSc6.2:Stormwater design - quality controlposted by Nathan Anderson on
Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.
Compliance for Corporate Interiors?
Pilot-Credits EQpc78:Design for active occupantsposted by Rachel Bannon-Godfrey on
Our project is utilizing a 3-story interconnecting stair inside a corporate office space on floors 8,9,10.
Fueling Capacity - multiple stations
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Garrett Ferguson on
In regards to the number of fueling stations, we have a charger that can charge 2 cars simultaneously (one plug on either side), and can reach 2 spots in either direction with a long cord.
IEQ4.1 Aerosol Adhesives conversion
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Kevin Taterus on
Using IEQc4.1 template version 4.0, in the notes under table IEQc4.1-1, the note #1 states "in the case of aerosol adhesives, the project team must provide a conversion of both the product VOC cont
green cleaning
CS-2009 IDc1:Innovation in designposted by Alfonzo Collins on
Realizing I should have posted this here...I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease,
Precertification - LEED 2009 Core & Shell
CS-2009 SSp1:Construction activity pollution preventionposted by Michael Heacock on
We are working on submitting a precertification. I'd thought the credits team was working on were design phase. If I submit the precertification, can I quickly turn in for design phase.
Asbestos Abatement Requirement Compliance
NC-2009 SSc3:Brownfield redevelopmentposted by UO Design and Construction on
We always conduct asbestos surveys (assessments) in accordance with the LRAPA regulations Title 43.
IEQ c4.3 Flooring
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Rezkar Abdulmajeed on
We have a project with some floor areas designed to be ceramic and quarry tiles. Can someone advise if the two above need to meet floorscore standrads. your comments are appreciated